[custom-twitter-feeds feed=6]

Status on 22/02/2026 at 6AM CEST
AGSI
  • EU -0.21
    352.85 TWh stored
    30.88% full
  • AT -0.32
    37.51 TWh stored
    37.22% full
  • BE 0.13
    2.19 TWh stored
    24.39% full
  • BG -0.3
    3.14 TWh stored
    44.79% full
  • HR -0.33
    0.61 TWh stored
    12.75% full
  • CZ -0.39
    15.46 TWh stored
    32.86% full
  • DK 0.06
    2.63 TWh stored
    26.85% full
  • FR -0.18
    26.57 TWh stored
    21.14% full
  • DE -0.12
    51.55 TWh stored
    20.53% full
  • HU -0.25
    25.19 TWh stored
    37.05% full
  • IT -0.13
    99.22 TWh stored
    48.79% full
  • LV -0.14
    5.17 TWh stored
    20.79% full
  • NL -0.24
    17.10 TWh stored
    11.85% full
  • PL -0.33
    19.20 TWh stored
    52.87% full
  • PT 0
    2.74 TWh stored
    76.72% full
  • RO -0.63
    12.94 TWh stored
    38.2% full
  • SK -0.39
    11.24 TWh stored
    30.19% full
  • ES 0
    20.38 TWh stored
    56.86% full
  • SE -0.36
    0.03 TWh stored
    30.69% full
  • NE -0.15
    55.60 TWh stored
    16.86% full
  • UA -0.15
    52.90 TWh stored
    16.53% full
  • GB* 0
    2.71 TWh stored
    27.45% full
ALSI
  • EU
    4559.6 GWh/d send-out
  • BE
    668 GWh/d send-out
  • HR
    84.4 GWh/d send-out
  • FI
    39 GWh/d send-out
  • FR
    752.6 GWh/d send-out
  • DE
    500.3 GWh/d send-out
  • GR
    161.6 GWh/d send-out
  • IT
    630.5 GWh/d send-out
  • LT
    121.5 GWh/d send-out
  • NL
    616.5 GWh/d send-out
  • PL
    253.9 GWh/d send-out
  • PT
    181.1 GWh/d send-out
  • ES
    550.3 GWh/d send-out
  • AI
    572.1 GWh/d send-out
  • ES*
    572.1 GWh/d send-out
IIP
  • Gas Storage Poland
    Other unavailability
    Unplanned
  • Gas Storage Poland
    Other unavailability
    Unplanned
  • JSC Conexus Baltic Grid
  • JSC Conexus Baltic Grid
  • JSC Conexus Baltic Grid

[COUNTER_PRO id=12192]

For Paper on News Section
New Joint Statement on EU Permitting Reform Published
The Informal Coalition on Permitting has released a new joint statement calling for structural improvements to Europe’s permitting framework. The document outlines cross‑industry priorities to accelerate project deployment and strengthen [...]
For Paper on News Section
Luis Ignacio Parada reappointed as GLE President
Gas Infrastructure Europe (GIE) is pleased to announce the re-election of Luis Ignacio Parada as President of Gas LNG Europe (GLE) for a second two-year term, ensuring continuity in the [...]
UPDATED_H2 Infra Map Q4 2025_SoMe3
Updated Hydrogen Infrastructure Map Available!
The latest Hydrogen Infrastructure Map is live, showing new trends and timeline adjustments for hydrogen projects across Europe. Key updates include changes to the German, Spanish, Austrian, and Nordic networks, [...]
For Paper on News Section
GIE Welcomes EU Grids Package
GIE supports the EU Grids Package as a key step for a more connected and resilient European energy system. Joint planning of electricity, hydrogen, and CO₂ networks will help ensure [...]