Your hands-on energy infrastructure partner.

Giga builds and operates energy infrastructure — equipment, sites, and market optimization — to power the modern grid and meet AI demand faster.

Image
Image
Image
Image
Image
Image
Image
Image
Image

One partner to build, deploy, and operate energy infrastructure.

Giga integrates site origination and development, manufacturing, and market operations under one integrated model. One partner from spec to site.

3.5

GW BUILT

Infrastructure Manufacturing

Transformers, switchboards, and data centers with industry-best lead times.

See Product Lines
Image
175 MW deployed

500 MW in pipeline

Site Origination & Development

We develop and operate turnkey data center sites with in-house manufacturing to energize faster than anyone else.

Explore sites
Image
$50-80k

Per MW in SPP

Power Market Optimization

Optimize flexible load economics with Giga Power Systems to earn more per megawatt.

Try Giga power systems
Image
American Innovation

Expanding the grid across the U.S.

Our vertically integrated approach powers Giga Energy's factories, offices, and energized sites around the country.

Image
ImageImage
Project Charleston MWGiga Energy Office
Image
ImageImage
Project Houston MWGiga Energy Factory
Image
ImageImage
Project Houston MWGiga Energy Office
Image
ImageImage
Project Long Beach MWGiga Energy Factory
Image
ImageImage
Project San Francisco MWGiga Energy Office
Image
ImageImage
Project Able40 MW
Image
ImageImage
Project Manning19 MW
Image
ImageImage
Project Wallis20 MW
Image
ImageImage
Project Stockton10 MW
Image
ImageImage
Project Lavon40 MW
Image
ImageImage
Project Brazoria17 MW
Image
ImageImage
Project Mustang20 MW
Image
ImageImage
Project Wildcat10 MW
Image
ImageImage
Project Jimmy10 MW
Image
ImageImage
Project Macalester20 MW

INFRASTRUCTURE

Custom energy infrastructure, delivered faster.

We’ve delivered more than 3.5 GW of transformers, switchboards, and data centers built in Houston, TX and Long Beach, CA.

  • Fast lead times on in-stock inventory & made-to-order options
  • Flexible engineering for custom projects
  • Responsive US-based support & service

Transformers

3-phase padmount and substation transformers. Shop in-stock inventory or get a quote for a custom build.

Image

Switchgear

Highly customizable modular power distribution solutions built and delivered on fast turnarounds.

Image

Data Centers

Air-cooled and liquid-cooled modular data centers for flexible loads.

Image

Energizing the world’s infrastructure

We’re powering hundreds of customer sites globally.

3.5+

Total GW

200+

Switchboards Built

1000+

Transformers Built

750+

Data Centers Built

Site Origination & Development

Experienced site developers with MWs.

We develop and operate MW-ready data center sites through our integrated supply chain and general contractor teams.

Site Development & Origination
175 MWs

Data centers built

500+

MWs Pipeline

Image
Image
Image
Image

POwer Markets

Power market optimization for flexible loads

Our Giga Power Systems platform maximizes revenue potential for flexible data center loads.

Get A Demo
  • Up to $80k per MW in SPP
  • Built for site-level economics
  • Proven across our 175 MW of flexible-load sites

customer stories

Satisfied Customers Across the Country

Publicly Traded AI Hyperscaler

“Giga's 7-week turnaround and custom engineering allowed us to scale up GPUs quickly.”

a switchboard on a light background

Satokie Mining

“Giga stepped up and delivered exactly when they said they would.”

Image

Simple Mining

“Giga’s never let us down. They’re always there when we need them.”

Image

Data center on a tight timeline

"The 3000 kVA padmounts not only arrived on the tight timeline, but we've been satisfied with the quality of the equipment since the site was energized."

Image

Modular data center in Texas

“Our electricians let us know multiple times how much they prefer the GIGA PDUs and equipment to anything else they have installed. It’s the best packaging and delivery on any single piece of infrastructure we ordered.”

Image

Let’s build what’s next together.

Image
70.9
"
82.7
"