Key Projects

Image

Greenbox Projects

Oviedo

View project

Oviedo, 33011 Municipality of Oviedo, Asturias, Spain

43°23`N 5°50´W

Operating since

2027

Storage

CountriesSolar (MW)Storage (MWh)Hybridization (MWh)
Spain1,250 MW5,706 MWh3,469 MWh
Italy550 MW7,258 MWh1,775 MWh
United Kingdom172 MW4,439 MWh460 MWh
Germany401 MW1,520 MWh0 MWh
Chile5,276 MW5,280 MWh22,214 MWh
Colombia241 MW0 MWh0 MWh
Mexico777 MW0 MWh590 MWh
Peru1,667 MW0 MWh4,000 MWh
United States1,234 MW2,345 MWh1,675 MWh
Poland0 MW4,720 MWh0 MWh
Romania0 MW6,752 MWh0 MWh
Total11,568 MW38,020 MWh34,183 MWh

Pipeline stages

Different projects in development, ready to build or at different stages of maturity.

20 - 40%

Identified Opportunities

A project that is technically and financially feasible, given that: the possibility of land exists, access to the electricity grid is operationally feasible, and/or the possibility of selling to third parties also exists.

50%

Early stage

A project that is technically and financially feasible, given that: the possibility of land exists, access to the electricity grid is operationally feasible, and/or the possibility of selling to third parties also exists.

70%

Advanced development

A project is advanced when land is secured (>50% chance) and grid access approval is likely (>90%). It is pre-construction when land, grid access, and environmental approval (>90%) are secured, with a PPA or equivalent agreement ready to sign.

90%

Backlog

Project in its final stages prior to construction, where: the land and access to the electricity grid are guaranteed, the probability of the environmental permit being approved is more than 90%, and there is a PPA in place; or a framework contract with an off taker or bank ready to be signed; or a bankable price stabilization scheme.

100%

Under construction

The EPC constructor has been given the order to start building.

100%

IPP operation

Project acceptance has been signed. Responsibility for the asset has been transferred from the constructor to the operations team.

Always green whenever wherever

Image

Hybridization - Spain

Under operation

Escuderos

  • CAPACITY: 200 MW.
  • HOMES POWERED: - GWh. annually
  • CARBON SAVED: 144.690 tonnes over a 40 years
  • LOCATION: Poveda de la Obispalía, Spain
  • DATE: 2024
View project