Cleaning shutdowns waste energy equal to 2M European homes!

We clean biogas reactors without stopping production.

Image

Image

Image

Image

In one client digestor, the aggitator system had collapsed and heavy sedimentation buldt up limiting capacity. The client needed to empty the tank, to allow for installation of an alternative aggitator system. Traditional draw-down and cleaning would have required a 3 week long draw-down period, before full shutdown and manual entry – resulting in up to 10 weeks of lost production — an option that would have impacted both revenue and safety. Instead, they used Sandcatch Solutions.

  • The reactor stayed in full operation throughout the draw-down
  • The biological process remained perfectly stable during the draw-down period.
  • Over 70 days of downtime were avoided
  • Annual gas production increased by 19%, due to limited shut-down period
  • Mechanical load on pumps and dryers were significantly reduced
Image

Image

Image

You avoid downtime, lost gate fees (mottaksgebyrer), and reduced gas output.


Far less volume goes to landfill — and transpor and deposit costs drop dramatically.


Lower mechanical load on pumps and agitators.

Reduced energy consumption per kWh of biogas produced.