From Requirements to Code. Verified.

Turn feature ideas into specifications that fit your system. Give your coding agent connected context, then verify the implementation.

For teams building with AI coding agents like Codex, Cursor, or Claude Code. Keep architectural drift in check and code aligned with product intent.

Start with Reqode
PR-21 · 1 / 13
Explore your product specifications
1 of 13

Explore your product specifications

Start from FieldDesk’s dashboard and explore Requirements, Data Entities, User Interfaces, or API Operations.

Problems Reqode Focuses On

Product context gets lost. Architecture drifts. Handoffs multiply. AI agents lose autonomy.

Image

AI Loses the Product Model

Decisions get lost in prompts and conversations, so every session needs the same context again. Agents miss related APIs, data, and UI behavior.

Image

Architecture Drifts as the Codebase Grows

Local changes drift from architectural rules, component responsibilities, and subsystem boundaries that the agent cannot see.

Image

Product Changes Need Too Many Handoffs

You break a product change into database, API, and UI tasks, repeat the context, and connect the results yourself. Each step needs another prompt, another handoff, and more of your attention.

How Reqode Solves It

Reqode gives teams a connected, branch-aware product and implementation model, exposes focused context to AI agents, and verifies work against that source of truth. Use the model to guide the next feature, then use verification and reviewed changes to keep it current.

  1. Product model Requirements, APIs, data, UI, architecture, linked code
  2. Feature specifications Reviewed changes with connected context
  3. Agent implementation A defined change guided by the model
  4. Verification & reviewed updates Check the result and resolve differences
  5. Product model Updated context for the next change
Ready for the next change

Capabilities

Image Specification Management
Connected, branch-aware specs for requirements, data entities, APIs, UIs, wireframes, and tests, with controlled revision flows.
Image Architecture and Unit Catalog
A catalog of subsystems, units, files, dependencies, and spec links, so humans and AI see the intended code structure.
Image MCP Context for AI Coding Agents
Read-only, branch-aware context for coding agents: requirements, units, file traces, manifests, and change requests for the current task.
Image Structured AI Assistants
AI workflows for analysis, architecture, tests, reviews, and spec updates, with drafts, validation, and explicit apply steps.
Image Specs to Code Verification
Checks specs, units, files, architecture rules, and implementation alignment; verified problems become tracked Findings.
Image Change, QA, and Issue Traceability
Connects change requests, specs, findings, issues, tests, commits, and repo sync data so teams see impact and status.

Start with one product area

Structured, Verified Memory for AI Agents

Reqode gives AI coding agents a structured, verified memory of your product: requirements, specifications, architecture rules, software units, and change history. Through MCP, agents retrieve focused, branch-aware context for each task, while Reqode's verifiers keep that source of truth aligned with the code.

Reqode connects product specifications, AI agents, implementation, and verification.

Frequently Asked Questions

Which coding agents can I use?Image

Use an MCP-compatible agent such as Codex, Cursor, or Claude Code. Reqode supplies product and implementation context while the agent works in your coding environment. See MCP for Coding Agents.

Can I start with existing code?Image

Yes. Start with one relevant area, connect its repository context, and review the specifications that describe it. You can expand the model as you make further changes.

Who prepares the specifications?Image

Your team can write them directly or use AI Analyst to clarify a feature and propose changes. Review the proposed diff and apply the accepted result.

What does my team still decide?Image

Your team chooses the intended behavior, accepts specification changes, reviews the implementation and evidence, and decides what to release.

How is the result checked?Image

AI verifiers inspect specifications, architecture guidance, and linked implementation within their defined scope. Test runs record execution results. Review both kinds of evidence; a completed check is not a guarantee that a feature is correct.

How does Reqode help prevent architecture drift?Image

Reqode connects implementation with subsystem architecture rules, unit guidelines, and component responsibilities. AI verifiers check the selected code against that guidance and record findings for your team to review. Explore architecture checks.

What if the specification needs to change?Image

Review the intended behavior before choosing a correction. If the product decision has changed, your team can use AI assistance to prepare a specification update, review and apply it, then check the implementation against the revised specification. Explore how to resolve a mismatch.