]

Build AI factories faster.

Giga deploys AI data centers faster than anyone else with our in-house manufacturing and powered land portfolio.

Image
Image
Image
Image
Image
Image
Image
Image
Image

One partner from spec to site.

Giga integrates site origination, manufacturing, and development to build AI factories faster.

4.5

GW BUILT

Infrastructure Manufacturing

Giga builds everything data centers need. U.S.-based factories powered by American engineering.

Explore Manufacturing
Image
175+ MW deployed

500+ MW in pipeline

Site Origination

We offer pre-permitted, powered land for data center builds by working closely with utility partners.

Research Origination
a fully built Giga AI factory
9

month deployment timeline

Development and Operation

With 200MW in operation and 500MW in progress, we are experienced data center developers and operators.

See the Process
A drone photo of a Giga Energy AI factory
American Innovation

Expanding the grid across the U.S.

Our vertically integrated approach powers Giga Energy's factories, offices, and energized sites around the country.

Image
ImageImage
Project BFD23 MW
Image
ImageImage
Project Wise-East25 MW
Image
ImageImage
Project Catalyst40 MW
Image
ImageImage
Project Win-East25 MW
Image
ImageImage
Project Houston MWGiga Energy Factory
Image
ImageImage
Project Houston MWGiga Energy Office
Image
ImageImage
Project Long Beach MWGiga Energy Factory
Image
ImageImage
Project San Francisco MWGiga Energy Office
Image
ImageImage
Project Able40 MW
Image
ImageImage
Project Manning19 MW
Image
ImageImage
Project Wallis20 MW
Image
ImageImage
Project Stockton10 MW
Image
ImageImage
Project Lavon40 MW
Image
ImageImage
Project Brazoria17 MW
Image
ImageImage
Project Mustang20 MW
Image
ImageImage
Project Wildcat10 MW
Image
ImageImage
Project Jimmy10 MW
Image
ImageImage
Project Macalester20 MW

INFRASTRUCTURE

Custom AI energy infrastructure, delivered faster.

We’ve delivered more than 4.5 GW of transformers, switchboards, power, and cooling AI infrastructure built in Houston, TX and Long Beach, CA.

  • Fast lead times on in-stock inventory & made-to-order options
  • Flexible engineering for custom projects
  • Responsive US-based support & service

Transformers

3-phase padmount and substation transformers. Shop in-stock inventory or get a quote for a custom build.

Image

AI Power and Cooling

Whitespace, hydro-cooled AI compute modules that drop into data center halls.

Image

Power Distribution

Highly customizable modular power distribution solutions built and delivered on fast turnarounds.

Image

Speed doesn't take shortcuts.

Powering hundreds of customer sites globally — the right way.

4.5+

Total GW

200+

Switchboards Built

1000+

Transformers Built

18

Sites Operational

Site Origination & Development

Experienced site developers with MWs.

We develop AI-ready data center sites within nine-month timelines. A vertically integrated supply chain, including our own factories and general contractor teams, allow us to do what no one else can.

Site Development & Origination
175+ MWs

Data centers built

500+

MWs Pipeline

inside a giga data center
man working on giga equipment outside
sun rising on giga data center
Image

POwer Markets

Earn $60-80k per MW with power market optimization

The Giga Power Systems platform maximizes revenue potential for flexible data center loads.

Get A Demo
  • Up to $80k per MW in SPP
  • Built for site-level economics
  • Proven across our 175 MW of flexible-load sites

customer stories

Satisfied Customers Across the Country

Publicly Traded AI Hyperscaler

“Giga's 7-week turnaround and custom engineering allowed us to scale up GPUs quickly.”

a switchboard on a light background

Midwestern Data Center on a Tight Timeline

"The equipment not only arrived on the tight timeline, but we've been extremely satisfied with the quality since the site was energized."

Image

Data Center in Texas

“Our electricians let us know multiple times how much they prefer the GIGA equipment to anything else they have installed. It’s the best of any single piece of infrastructure we ordered.”

Image

Let’s build what’s next together.

Image
70.9
"
82.7
"