Vale - página inicial

Last updates

Dam Forquilha I, in Ouro Preto, had its emergency level reduced by ANM

Emergency Level of Forquilha I Dam Lowered from Level 2 to Level 1

Yellow bucket-wheel reclaimer over iron ore stockpile at open-pit mine

Vale’s production and sales in 2Q26

Vale team reviewing a document in an industrial area, wearing safety gear.

Vale announces dates for 2Q26 performance report

Panoramic view of Vale's Capanema Mine in Minas Gerais, Brazil, featuring iron ore processing facilities and conveyor belt structures surrounded by mountains and native vegetation. Photo: Nayara Leite.

Vale Reinforces Pioneering Approach in New ISSB-Standard Report, Highlighting Circular Economy as a Business Opportunity

Vale publishes its 2025 GHG Emissions Report and reinforces its commitment to climate transparency

Vale publishes its 2025 GHG Emissions Report and reinforces its commitment to climate transparency

Four Vale professionals wearing hard hats and safety vests review documents at one of the company's mining facilities.

1Q26 Performance Disclosure Dates

Maravilhas II Dam, in Itabirito (MG), has emergency level removed

Maravilhas II Dam, in Itabirito (MG), has emergency level removed

Vargem Grande

Vargem Grande Dam, in Nova Lima (MG), has emergency level ended

Barragem CG

Vale completes decharacterization work on its 19th upstream dam

Vale updates its Climate Change Policy

Vale updates its Climate Change Policy

Barragem 6

The Dam 6 of Águas Claras mine, in Nova Lima, has its emergency level removed

Vale has eliminated the 18th upstream structure and reached 60% progress on its Upstream Dam Decharacterization Program

Vale has eliminated the 18th upstream structure and reached 60% progress on its Upstream Dam Decharacterization Program

Forquilhas III

Vale reaches significant milestone with reduction of Forquilha III dam emergency level 3

Vale launches consultation to prioritize relevant topics in sustainability management and reporting

Vale launches consultation to prioritize relevant topics in sustainability management and reporting

Vale has implemented GISTM across all its tailings dams

Vale has implemented GISTM across all its tailings dams

Vale achieves 100% adherence to practices recommended by the Brazilian Corporate Governance Code

Vale achieves 100% adherence to practices recommended by the Brazilian Corporate Governance Code

The Xingu Dam in Mariana, Minas Gerais, has its emergency level reduced

The Xingu Dam in Mariana, Minas Gerais, has its emergency level reduced

Vale featured in Global GRI & TNFD Case Study Report: Advancing nature-positive ESG leadership

Vale featured in Global GRI & TNFD Case Study Report: Advancing nature-positive ESG leadership

Vale starts the first phase of the Decharacterization Program at Xingu Dam

Vale starts the first phase of the Decharacterization Program at Xingu Dam

Vale reaches 50% of its voluntary forest protection target for 2030

Vale reaches 50% of its voluntary forest protection target for 2030

Showing 1 to 20 of 162 entries.
Scroll to see more

Our Commitments

Image

Climate change

  • Reduce absolute Scope 1 and 2 greenhouse gas emissions by 33% by 2030;
  • Achieve net zero Scope 1 and 2 emissions by 2050;
  • Reduce net Scope 3 emissions by 15% by 2035
Image

Dams

  • Decharacterize* all upstream tailings dams in Brazil by 2035;
  • Have no upstream tailings dams in a critical safety condition (Emergency Level 3) by 2025;
  • Implement GISTM at 100% of the TSFs** operated by Vale by 2025.
Image

Diversity, equity and inclusion

  • Double the representation of women in the workforce from 13% to 26% by 2025;
  • Increase the representation of women in senior leadership to 26% by 2025;
  • Achieve 40% Black representation in leadership positions in Brazil by 2026.
Image

Energy

  • Use 100% renewable electricity in Brazil by 2025 and globally by 2030;
  • Improve global energy efficiency by 5% by 2030.
Image

Forests

  • Restore and protect more than 500,000 hectares of forest beyond the Company’s boundaries by 2030.
Image

Health and safety

  • Reduce N1+N2 events compared to the previous year-end;
  • Reach zero fatalities;
  • Eliminate all risks classified as “very high” for health, safety, the environment and communities;
  • Reduce the number of exposures to harmful health agents in the workplace by 50% by 2025.
Image

Indigenous Peoples

  • Support neighboring Indigenous Peoples in developing and implementing their plans and in pursuing the rights set forth in the United Nations Declaration on the Rights of Indigenous Peoples (UNDRIP).
Image

Self-reliant communities

  • Help lift 500,000 people out of extreme poverty.

*Under Brazilian law, “decharacterization” means functionally reintegrating a dam and its contents into the environment so that it no longer serves its original purpose of containing tailings.
** Tailings storage facilities.

See also

com.liferay.portal.kernel.util.DateUtil_IW@52321385

Legenda da imagem

People

We strive to be a company that increasingly places people at the center of decision-making. 

com.liferay.portal.kernel.util.DateUtil_IW@52321385

Legenda da imagem

Safety

We are working to make Vale a safer, more reliable company. 

com.liferay.portal.kernel.util.DateUtil_IW@52321385

Legenda da imagem

Reparation

We remain committed to fully repairing the impacts of the B1 and Fundão dam failures.

com.liferay.portal.kernel.util.DateUtil_IW@52321385

Legenda da imagem

Nature and Climate

We recognize that our business is highly dependent on nature and has a significant impact on it.