Digital Twin 2.0 premiere – live webinar Nov 19

DBR77 Digital Twin

Test layout, flow and capacity decisions on a digital twin of your plant

DBR77 Digital Twin builds your plant in 3D and simulates production over time: the queues, shared machines and bottlenecks that averages hide. Compare variants on a copy of the model before you move a machine or sign an investment.

  • Runs in the browser
  • AI assistant: built-in, on-prem or your own via MCP
  • Your team approves every decision
Studio 3DStudio 3D

The problem

Layout and investment decisions still rest on drawings and spreadsheets

DBR77 Digital Twin simulates the flow over time, queue by queue, so you test the decision before you make it.

  • A drawing shows where things stand

    It does not show how parts, people and forklifts move through the layout during a shift.

  • A spreadsheet adds up averages

    Waiting, blocking, changeovers and shared machines disappear in an average, so the real bottleneck stays hidden.

  • Without a model, the plant is the test bench

    A wrong layout or investment shows up only after the change, in lost output and rework.

How it works

From the layout to a tested decision in six steps

Start with the data you have. Even nominal times are enough for a first model, and the gap between the model and the floor shows where to look.

  1. Scope and layout

    Choose the area and the decision. Bring in the plant layout from DWG or DXF, with walls created automatically.

    Scope and layoutScope and layout
  2. 3D model

    Place machines, robots, racks, vehicles and people from the model library in Studio 3D.

    3D model3D model
  3. Process

    Describe the flow: routings, stations, buffers, operators and vehicles.

    ProcessProcess
  4. Times and data

    Enter cycle and setup times by hand, or bring them in by import (scope to be confirmed).

    Times and dataTimes and data
  5. Base model

    Run the current state and compare it with what the floor produces. The gap shows the real bottleneck.

    Base modelBase model
  6. Variants and decision

    Test each change on a copy of the base model and compare throughput, WIP, lead time and on-time delivery.

    Variants and decisionVariants and decision

Results

Results from DBR77 Digital Twin projects

Figures from published DBR77 case studies. Each one comes from a single plant and a single decision.

+6%

daily output of the chosen layout compared with a linear layout

Production line design

Up to 60%

less time spent picking material from the warehouse

Warehouse picking

−14%

department costs after the layout change, with PLN 300,000 less working capital

Layout optimization

3

layout variants of a new production line compared side by side

Production line design

Case studies

How manufacturers used the twin

Assembly benches of a straight line seen from a high angle in DBR77 Digital Twin 2.0Assembly benches of a straight line seen from a high angle in DBR77 Digital Twin 2.0

Car lamp manufacturer, southern Poland

Production line design: 6% more output per day

+6% daily output compared with a linear layout

A 2D plan zoomed in on racks and storage areas in DBR77 Digital Twin 2.0A 2D plan zoomed in on racks and storage areas in DBR77 Digital Twin 2.0

Plastic injection molding for household appliances, central Poland

Automation concept: an autonomous cart at the bottleneck

over 100% higher efficiency at the bottleneck

A comparison of two layout variants in DBR77 Digital Twin 2.0: what changed and the key figuresA comparison of two layout variants in DBR77 Digital Twin 2.0: what changed and the key figures

Wooden furniture manufacturer

Layout optimization: 14% lower department costs

14% lower department costs

Product

What you work with

Real screens from DBR77 Digital Twin. Each one leads to its product page.

3D plant model in Studio 3D

Build a 3D model of your plant in the browser. Place machines, robots, conveyors, racks, vehicles and people on your layout and review the model with the team before anything moves on the floor.

Data and integrations

Start with the data you have. Nominal times are enough to start: enter routings, stations and times by hand, or bring them in by import (import scope to be confirmed). Integrations with ERP, MES and other systems, including DBR77 IRIS, are individual projects.

VR review

Review the 3D model at 1:1 scale with a VR headset, so the team can stand in the planned layout before it is built.

Data

Works with the data you already have

Build the model from your layout and process data, check it against what the floor produces, then add data from DBR77 IRIS and DBR77 IIoT where it improves the decision.

Your layout and times

The layout from DWG or DXF, plus cycle times and routings entered by hand or brought in by import (scope to be confirmed). Nominal times are enough to start.

DWG / DXF layoutCycle timesRoutingsShift calendar

DBR77 IRIS

Integrations with ERP, MES and other systems are individual projects, with the scope to be confirmed. Data can also be entered by hand or imported.

Production ordersStationsRoutingsIndividual scope
Go to DBR77 IRIS

DBR77 IIoT

DBR77 IIoT monitors machines: cycle times, stops and machine states. It is the next stage when the model is used regularly. The twin itself does not connect to PLCs or robots.

Cycle timesStopsMachine states
Go to DBR77 IIoT

Human approval

The model and its reports support the analysis. Your team makes and approves the decision.

Next step

Map the data you have today and agree how it is entered or imported.

Why a twin

Flow over time, queue by queue

Two comparisons that show what a twin adds to drawings and spreadsheets.

2D CAD vs 3D digital twin

A drawing shows where things stand. The twin shows how parts, people and vehicles move through that layout during a shift.

Averages vs simulation over time

Averages hide queues, shared machines and due dates. Factory Sim simulates the week deterministically and shows them, so a difference between two variants comes from the change, not from noise.

Where it applies

Wherever material and people move through space

Most projects are in production and intralogistics. The same model also works for new halls, presales, services and training.

  • Production

    Lines, stations, buffers, people and machines, with the flow of a whole shift.

    Layout · Line balancing · WIP

  • Logistics

    Warehouses and internal transport, where material flow sets the output.

    Routes · Picking · Forklifts and AGVs

  • Real estate & facilities

    New halls and expansions, where space, access and the order of moves must be checked early.

    CAPEX · Expansion · VR

  • Suppliers & integrators

    3D presentations and showrooms for machines, robots and automation.

    Showroom · Presales · Marketplace

  • Services & operations

    Any place where people and tasks move through space and resources are limited.

    Queues · Capacity · Shifts

  • Education

    3D models of the plant for training new employees and preparing changes.

    Training · Safety · VR

By role

What the twin shows each decision-maker

The same model answers different questions for operations, engineering, logistics and finance. Choose a role to see its typical problems and what the twin shows.

Trust

Security is foundational, not optional.

A long-term Digital Twin becomes the system of decision-making. Security, governance, and data boundaries must be designed-in from day one.

Enterprise-grade posture

Strong defaults for identity, access, encryption, and auditability.

Data residency options

Keep data in your required region and maintain regulatory compliance.

Human approval layer

AI supports analysis; your leadership retains final accountability for decisions.

Next step

See your plant in DBR77 Digital Twin

Talk to an expert about your layout and the decision ahead of you, or create an account and try Studio 3D yourself.