Contact Sales & After-Sales Service

Contact & Quotation

  • Inquire: Call 0086-755-23203480, or reach out via the form below/your sales contact to discuss our design, manufacturing, and assembly capabilities.
  • Quote: Email your PCB files to [email protected] (Preferred for large files) or submit online. We will contact you promptly. Please ensure your email is correct.
Drag & Drop Files, Choose Files to Upload You can upload up to 3 files.

Notes:
For PCB fabrication, we require PCB design file in Gerber RS-274X format (most preferred), *.PCB/DDB (Protel, inform your program version) format or *.BRD (Eagle) format. For PCB assembly, we require PCB design file in above mentioned format, drilling file and BOM. Click to download BOM template To avoid file missing, please include all files into one folder and compress it into .zip or .rar format.

PCB Documentation Package: What to Include for Manufacturing

A PCB documentation package is the controlled set of design outputs and instructions used to quote, fabricate, assemble and inspect a specific board revision. Start with the work being ordered: bare-board fabrication, assembly of supplied boards, or a combined build. Agree the accepted data format and the required supporting documents with the receiving supplier. The objective is a consistent, reviewable release, not a promise that engineering questions will disappear. If the order scope is still open, compare the fabrication and assembly deliverables before deciding which file sets to release.

Use the worksheet below to identify missing deliverables, then review the fabrication, assembly and release-control checks. It checks your declared file list only; it does not inspect uploaded CAD data or approve a design for manufacturing.

RELEASE WORKSHEET

What is missing from your file package?

Choose the order scope and list the files you intend to send. This is a local checklist of your declarations, not a CAD file analyzer or manufacturing approval.

How to list files and revisions

Enter one row per artifact: role | filename | revision. Allowed roles: fabdata, drill, fabspec, netlist, bom, placement, assembly, test. Revisions can differ if the release manifest maps the approved versions. For a combined artifact, enter a separate role row using the same filename and revision. Do not include passwords or private access tokens.

For accepted intelligent data, confirm whether drill and placement information are actually present. The format name alone is not proof. The BOM and special instructions still need checking.

Your manifest stays in this page. Nothing is uploaded or saved automatically.

Resolve fabrication release conflicts

Select local files to review their names, or bring in the manifest from the existing release worksheet. Confirm each inferred file role and revision against the controlling drawing. Archives remain unopened.

Release items

Check geometry in Online DFM

Key takeaways

  • Specify the documentation standard and revision agreed for the project. IPC-2614 addresses board fabrication documentation; do not substitute a different standard simply because a web guide calls it newer.
  • State whether a hole size is finished or a tool diameter. Give the required finished diameter, tolerance and plating status, especially for press-fit connectors. Do not derive a production drill size from a generic plating allowance.
  • Conflicting drawings and data require a documented clarification before tooling. Do not assume that one file automatically overrides another.
  • Reference the agreed standard, revision, class where applicable and approved exceptions. Check notes and referenced requirements for contradictions.
  • Use one release manifest to map the approved revision of each artifact. Drawings, firmware and BOMs may have different revision schemes; they must belong to the same approved build configuration. Use the mixed-revision release checklist to catch a newer artwork export paired with an older drawing or drill file.

Find the file that breaks a manufacturing release

A complete file set has a common revision, coordinate system and manifest. File count alone cannot establish that copper, drill and outline belong together.

Manifest entryExample releaseFinding
Copper and profileRev FSame source revision
Drill tableRev EResolve before release
NetlistRev FCheck against the final selected drill and copper
Illustrative review record

Gerbers and drill map say Rev D; drawing says Rev C

Resolve the drawing revision before CAM uses tolerances or finish notes from that document.

Outline appears in two layers with different cutouts

Identify the controlling mechanical outline and withdraw the obsolete export from the release.

Issue a new manifest listing each manufacturing file, revision, units and the document that resolves any conflicts.

Prepare a project note
Part and revision — [confirm] Controlling outline — [confirm] Drill and netlist revisions — [confirm] Approved manifest — [confirm]
Background reading · Sierra Circuits

What a PCB Documentation Package Is and Who Reads Each Part

Bare PCB panel: fabrication data defines board and array geometry.
Bare PCB panel: fabrication data defines board and array geometry. Reference photograph by Gabriela P., source, CC BY 4.0; unchanged. Not PCBSync production evidence.

Fabrication CAM, assembly programming, purchasing and test engineering use different parts of a release. One supplier may perform several of these roles. Assign an owner to each deliverable and make open questions visible before authorizing the affected operation. For assembly programming and purchasing, the BOM and placement reconciliation shows how to check that both teams are working from the same populated variant.

ArtifactWho uses itWhat breaks without it
Copper, mask and legend dataFab CAM engineerLayer functions and geometry cannot be confirmed
Drill files, plated and non-plated separatedFab drillingPlating status or drill span may be ambiguous
Netlist (IPC-D-356)Fab electrical testAn independent design-to-manufacturing connectivity comparison may be missing
Fabrication drawingFab CAM and quotingMaterial, finish, class and tolerances need clarification
Stackup and impedance tableFab lamination and CAMElectrical requirements cannot be reconciled with the proposed construction
BOMAssembly purchasingWrong parts, wrong packaging, or a quote you cannot compare
Centroid / pick-and-place fileAssembly programmingPlacement units, origin, side or rotation may require clarification
Assembly drawingAssembly line and inspectionPolarity, orientation and do-not-fit intent may be unclear
Panel or array drawingBothArray handling and depanelization constraints may be missed
Test and programming instructionsAssembly testTest scope or the approved firmware image is undefined

The Gerber layer set communicates artwork geometry. Drill and route data communicate hole and mechanical operations. Drawings and notes make requirements easy for people to review. Intelligent formats can also carry attributes and product information, but you still need to confirm what was exported and what the receiving CAM workflow uses.

If the assembly team accepts component-layer data, use the Gerber X3 assembly data guide to identify what the export contains and which separate documents the supplier still needs.

Which Documentation Standard Applies to This Release?

Requirements traceabilityRequirements traceabilityPurchase specificationAgreed standard + revisionFabrication documentationProduct attributes + acceptanceRelease approvalRecorded owner + exceptions
Engineering workflow illustration: requirements traceability. No production or test result is implied.

Start with the purchase specification and your document-control procedure. Record the exact standard number, revision, product class where applicable and any agreed exceptions. A documentation standard describes the information to communicate; it is not a substitute for a fabrication performance requirement or an assembly acceptance agreement.

For a release that specifies handling or storage controls, use the bare-board handling and storage guide to identify which document and lot records the receiving team should have. Include who can authorize an exception.

The IPC-2614-2010 scope published by IPC identifies physical attributes and performance requirements for unpopulated boards. Its reference list identifies IPC-2613 as electrical, mechanical and discrete-wiring part descriptions, not as the assembly-documentation standard. Several documents in that historical list were marked as under consideration. Do not treat that list as proof that every numbered document is currently issued or applicable.

If an existing drawing cites IPC-D-325, ask the responsible document owner to confirm the applicable edition and contractual requirements. Do not automatically replace the citation, claim that its age makes the product noncompliant, or silently change a customer-controlled drawing. Check the publisher's current catalog and the actual purchased standard before approving a revision.

The Fabrication Data Set: Gerber, Drill, Netlist and Stackup

Finished plated hole and process allowanceSpecify the opening that must remainHole-wall copper (schematic)Finished opening + toleranceLaminate / board materialProcess tooling allowance is not a universal fixed subtraction.
Engineering workflow illustration: finished hole requirement. No production or test result is implied.

For a fabrication order, agree how the following information will be supplied. Some information can be carried inside an accepted intelligent dataset instead of in separate files. Assembly-only orders using supplied bare boards have a different scope.

  • Copper, solder mask, legend and paste layers, plus the board outline on its own layer. Confirm the accepted Gerber version or intelligent format before export. ODB++ is commonly supplied as an archive; IPC-2581 is a structured exchange format. Supported content and export settings still need checking.
  • Drill files in Excellon format, with plated and non-plated holes in separate files. Define slots and cutouts with their dimensions, plating status and tolerances. Depending on the export, these features may be represented in drill, route or mechanical data; check that the receiver can reconstruct them.
  • An independent connectivity reference, such as a CAD-generated IPC-D-356 netlist when supported. Compare it with manufacturing data to help identify export or CAM discrepancies. It cannot prove that the original circuit design itself is correct.
  • A fabrication drawing with board outline and critical dimensions, drill chart, stackup, notes and title block with revision.
  • The stackup and, if you have controlled impedance, an impedance table naming the target, tolerance and which layers carry which structures.

The stackup should identify layer order, material requirements, copper and relevant dielectric thicknesses, plus finished thickness and its agreed tolerance. For a controlled-impedance multilayer board, identify the structures, reference layers, target values, tolerances and verification plan. Review the proposed manufacturing construction and any geometry adjustments before release; do not assume an unspecified substitution is acceptable. If the construction is undecided, the standard versus HDI PCB comparison helps identify which via and layer choices need a fabricator response before the drawing is frozen.

A finished hole is the opening after the relevant manufacturing operations. A production drill tool may be larger to accommodate plating and processing. The drawing should state the required finished size and tolerance, while the fabricator establishes a suitable process. For a press-fit connection, start with the connector supplier's finished-hole requirement and confirm plating and fit conditions. Do not apply a universal two-mil correction or assume one hole tolerance follows automatically from an IPC class.

The Assembly Data Set: BOM, Centroid, Assembly Drawing and Test

Populated boards: the fitted BOM and assembly instructions describe what is added to the bare board.
Populated boards: the fitted BOM and assembly instructions describe what is added to the bare board. Reference photograph by Adam Greig, source, CC BY-SA 2.0; unchanged. Not PCBSync production evidence.

For PCB assembly, use the following checks to make the fitted configuration clear. A complete-looking spreadsheet can still contain ambiguous part identities or conflict with placement data. Before sending the package to suppliers, run the PCB assembly quote checklist to verify that each file describes the fitted configuration they are being asked to price.

Use the Altium Designer BOM export or KiCad BOM export guide to produce the parts list for the released variant. Compare the fitted designators with the matching placement file and assembly drawing.

For a separate placement file, follow the instructions for your editor and check the origin and component rotation against the release drawing. The available guides cover EAGLE placement export, KiCad placement export and Altium Designer centroid export.

ArtifactWhat it must contain
BOMReference designators, quantity per board, full manufacturer part number including packaging suffix, manufacturer name, description, package, and an explicit approved-alternates column. Mark do-not-populate lines clearly, and communicate moisture-handling requirements from the component specifications where applicable
Centroid fileReference designator, X and Y in stated units, rotation, and layer (top or bottom). State the origin and the rotation convention; these are the two things that most often need rebuilding
Assembly drawingComponent outlines with reference designators, polarity and pin 1 markings, top and bottom views, do-not-populate call-outs, hardware and any hand-assembly steps
Panel or array drawingArray layout, rail dimensions, break-away method, and fiducials; fiducials and handling requirements should be agreed with the assembler
Test and programmingWhat gets tested, pass criteria, which image goes into which device, and where the programming file lives
Special process notesConformal coating and keep-out areas, torque values, serialisation and labelling, ESD or MSD handling requirements

Define the substitution rule explicitly: approved alternates only, review before substitution, or no alternates. Preserve the manufacturer and full ordering code needed to identify the component. Packaging information may be part of an ordering suffix or supplied separately; confirm reel, tray or other delivery requirements rather than assuming every manufacturer encodes them the same way.

What Belongs in Fabrication Notes and What Does Not

Copper requirement conflict resolutionTwo instructions cannot silently become oneStackup table: requirement ACopied note: requirement BCurrent drawingSame release, different intentHOLD → obtain written clarificationCorrect source → reissue → confirm receipt
Engineering workflow illustration: resolve a copper conflict. No production or test result is implied.

Fabrication notes should define requirements that the receiving team can verify. State the agreed standards and revisions, relevant class, and project-specific conditions. Review copied notes against the current design instead of accumulating generic instructions.

Notes that earn their place:

  • Applicable fabrication performance, acceptance and assembly requirements, with their agreed revisions and classes where relevant. Separate bare-board and assembly scope. If the order requires a first article inspection report, identify the drawing revision, characteristics and evidence to include. For bare boards, agree which electrical and coupon records will appear in the shipment evidence review and how those records identify the delivered lot.
  • Material and Tg, surface finish, solder mask and legend colours, and whether vias are tented, plugged or filled. For filled features, the via filling inspection handoff shows which sides, layer spans and finished surfaces to identify in the controlled fabrication note.
  • Copper weights by layer, finished thickness and tolerance, and controlled impedance targets with tolerance.
  • The agreed bow and twist acceptance limit, test method and applicable condition, if this affects assembly or mechanical fit.
  • Anything that cannot be inferred from the data: castellations, edge bevels, countersinks, blind and buried via structures, back-drilling depths, UL marking requirements and the RoHS status you need.

Remove superseded notes, verify material and geometry instructions, and resolve inconsistent requirements before tooling. Agree an explicit document hierarchy where needed, but do not use that hierarchy to hide a known design conflict. Record the question, the affected files, the owner and the written disposition.

Illustrative conflict, not a customer case: a six-layer stackup table calls for one inner-layer copper specification while a copied note calls for another. The correct action is to flag the contradiction, confirm design intent, review the impedance implications and issue a consistent drawing/data package. Do not infer which instruction the factory followed or invent a production outcome. The 4 oz copper release checklist gives an example of separating starting foil and finished-copper requirements before comparing fabrication proposals.

How to Package and Release a PCB Data Set

Release manifest maps independent artifact revisionsOne approved configuration, several revision schemesRelease R07Manifest + approvalFabrication drawing — revision BAssembly BOM — revision 12Firmware — version 2.4Illustrative IDs: verify the mapping, not matching revision strings.
Engineering workflow illustration: one release, mapped revisions. No production or test result is implied.

Release discipline is what keeps the right board getting built six months from now. Six steps.

  1. Assign a release-set identifier and record each artifact's approved revision in the manifest. Different document revision schemes are acceptable when the mapping is controlled. Use the PCB drawing and CAD handoff guide when assigning the source design, mechanical model and released fabrication drawings to that manifest.
  2. Put the revision on the board itself if there is space. Use the agreed marking or traceability method to identify the build; markings must not compromise clearances or customer requirements.
  3. Include a README listing every file, what it is, the units it uses, and the revision. Include the responsible owner and any unresolved questions; the manifest supports review but does not replace technical verification.
  4. Zip the complete set as one archive. Prefer a complete replacement release. If a controlled delta is explicitly agreed, identify exactly what it supersedes and require confirmation that the receiving set has been reconciled.
  5. State units and origin explicitly in the README and on the drawings. Metric versus imperial confusion is rare but expensive when it happens.
  6. Keep the released archive unchanged and start a new revision for the next change, rather than editing files inside a released package.

The useful balance is enough documentation to define the required product without conflicting duplication. Review the DFM report and engineering questions against the released package. A query is not necessarily evidence of a poor design: a supplier may need to confirm process-dependent details. Track each disposition and approve a revised release when the answer changes the build requirements.

Common PCB Documentation Mistakes That Stall a Quote

Find the missing handoffFind the missing handoffSupplied board assemblyBOM + placement + instructionsBare-board fabricationLayer data + drill/route + specConditional requirementsPanel / impedance / programming
Engineering workflow illustration: find the missing handoff. No production or test result is implied.
  1. Sending Gerbers alone for an assembly quote. Board shape is not enough to price or build a populated assembly.
  2. Omitting an available independent connectivity reference without agreeing the alternative verification approach.
  3. Providing drill data with ambiguous plating status or unsupported combined-file conventions.
  4. Leaving slots or cutouts undefined across the drawing and drill/route data.
  5. Specifying total board thickness without the stackup, then being surprised by the impedance result.
  6. Using an unlabeled hole table without confirming finished size, tolerance and plating requirements.
  7. Carrying over fabrication notes that contradict the current data and failing to resolve the conflict.
  8. Leaving the approved-alternates column blank, turning every component shortage into an engineering query.
  9. Leaving ordering-code or supply-packaging details ambiguous.
  10. Sending a corrected layer instead of a complete revised package.
  11. Changing an agreed standard or drawing revision without the responsible approval.

Frequently Asked Questions About PCB Documentation Packages

Question to written dispositionQuestion to written dispositionA file conflict is foundIdentify affected requirementResponsible owner reviewsClarify or revise the packageReceiver confirmsUse the reconciled release
Engineering workflow illustration: question to written disposition. No production or test result is implied.

What files are needed for PCB fabrication and assembly?

For fabrication, provide the accepted layer dataset, unambiguous drill/route data, fabrication requirements and the agreed connectivity reference. For assembly, include a fitted BOM, placement information, assembly instructions and any applicable test/programming documents. Confirm whether an intelligent dataset replaces a separate placement or drill deliverable in the receiving workflow. For a functional test deliverable, include a PCBA functional test plan with the operating conditions and evidence required for acceptance.

Is IPC-D-325 still current?

Confirm the required edition and status with the publisher and the project document owner. The public IPC-2614 scope is useful for understanding fabrication-documentation coverage, but it does not authorize replacing a contractual reference. Verify the actual document and project requirements before changing a controlled title block.

What is the difference between a fab drawing and an assembly drawing?

The fabrication drawing defines the bare board: outline, drill chart, stackup, materials, finish, tolerances and class. The assembly drawing defines what goes on it: component locations, reference designators, polarity, do-not-populate calls and any hand-assembly steps. Different factories read them. The assembly drawing export guide shows how to check the selected variant, orientation and designators against the other released files. For rigid-flex construction, use the rigid-flex fabrication handoff to carry the regional stack, transition details and installed views into the package.

Do I still need a fab drawing if I send ODB++ or IPC-2581?

Ask what the receiver requires. ODB++ and IPC-2581 can carry structured manufacturing information, but an export may not include every required attribute. A human-readable drawing or specification remains useful for critical dimensions, tolerances, exceptions and approval. Check actual exported content instead of relying on the format name.

What should PCB fabrication notes include?

The governing standard and class, material and Tg, copper weights, surface finish, mask and legend colours, via treatment, finished thickness and tolerance, impedance targets, bow and twist limits, and anything non-standard such as castellations, bevels or back-drilling. Reference standards rather than restating them. For module edges, add castellated-hole geometry and receiving-footprint requirements so the fabrication outline and assembly interface can be reviewed together. For a header-mounted module, use the KiCad Arduino interface checklist to record the selected board revision, mating geometry and receiving footprint.

What happens if the drawing and the Gerber data disagree?

Pause the affected release and obtain a written clarification. Confirm the intended requirement, correct the inconsistent source and reissue a controlled set. Do not silently choose a drawing, Gerber file or purchase note merely because it is easier to use.

What must a BOM include for a PCB assembly quote?

Include reference designators, quantity per board, manufacturer and full ordering code, package, fitted/DNP status, and the approved-alternate policy. Clarify supply packaging and moisture handling where relevant. Keep purchasing allowances separate from the fitted quantity per assembly.

Releasing a Documentation Package Your Fabricator Can Build From

Final release gateFinal release gateConsistent filesManifest matches approved outputsClosed technical questionsWritten decisions retainedControlled handoffReceiver + release ID recorded
Engineering workflow illustration: final release gate. No production or test result is implied.

A useful release tells the receiving team what to build, how the files relate and which questions remain open. Use a release-set ID with a manifest of approved artifact revisions. The checks below are a practical starting point; they do not replace supplier review or the project's release authority.

Four things worth doing this month:

  1. Open your current fab drawing and check every note against the CAD data, especially copper weights, hole sizes and layer count. Delete anything carried over from a previous project.
  2. Check the standard number, edition and scope in your title block against the agreed project requirements before proposing a change.
  3. Record the approved-alternate policy and clarify full ordering codes and required supply packaging in the BOM or referenced purchasing instructions.
  4. Write a one-page README template listing files, units, origin and revision, and include it in every release from now on.

Review the PCB manufacturing documentation as one controlled release: fabrication and drill data, drawing, stack-up and agreed acceptance requirements must describe the same revision. Resolve conflicts and missing information before the fabricator starts tooling. If the job requires backdrilling, record the agreed backdrill requirements on the fabrication drawing before release.