There are ongoing Incidents
Don't agree with what's reported here? Contact us at support@selectel.ru.
Bare Metal Scheduled maintenance
Pools Scheduled maintenance
SPB-1 Operational
SPB-2 Operational
SPB-3 Operational
SPB-4 Operational
SPB-5 Operational
MSK-1 Scheduled maintenance
MSK-2 Scheduled maintenance
MSK-3 Operational
MSK-4 Scheduled maintenance
MSK-5 Operational
MSK-6 Operational
MSK-7 Operational
NSK-1 Operational
TAS-1 Operational
NBO-1 Operational
ALM-1 Operational
Services Operational
Dedicated Servers Operational
Colocation Operational
Racks Operational
Network Operational
Firewalls Operational
Cloud Platform Minor incident
Pools Minor incident
ru-1a Scheduled maintenance
ru-1b Scheduled maintenance
ru-1c Scheduled maintenance
ru-2a Operational
ru-2b Operational
ru-2c Operational
ru-3a Minor incident
ru-3b Minor incident
ru-3c Minor incident
gis-1a Operational
gis-2a Operational
uz-1a Operational
uz-1b Operational
uz-2a Operational
kz-1a Operational
ke-1a Operational
ru-6a Operational
ru-6b Operational
ru-6c Operational
ru-7a Operational
ru-7b Operational
ru-8a Operational
ru-9a Operational
Services Operational
Cloud servers Operational
Network Volumes Operational
Images Operational
Backups Operational
Loadbalancers Operational
Network Operational
Managed Kubernetes Operational
Container Registry Operational
Managed Databases Operational
Cloud functions Operational
Secrets manager Operational
Billing Operational
Cloud for 1C Minor incident
VMware Cloud Operational
Pools Operational
AVM1 | SILVER-1 Operational
AVM1 | GOLD-1 Operational
AVM1 + BRZ2 | PLATINUM-1 Operational
DUB3 | SILVER-1 Operational
DUB3 | GOLD-1 Operational
DUB3 + CVT2 | GOLD-1 Operational
Private Cloud Operational
SPB-DR-1 Operational
Services Operational
Virtual Data Centers Operational
Network Operational
VMware clusters Operational
vCloud Director Operational
Control Panel Operational
DaaS Operational
Cloud powered by VMware backup Operational
Backup SPB Operational
Backup MSK Operational
Backup Console SPB Operational
Backup Console MSK Operational
Network Services Operational
DNS-hosting Operational
Anti-DDoS Operational
Content delivery network Operational
Fault-tolerant load balancer Operational
Monitoring Operational
Direct connect Operational
Global connect Operational
Global router (L3VPN) Operational
File storage Operational
Mobile farm Operational
Data centers Scheduled maintenance
Moscow Operational
Berzarina-1 Operational
Berzarina-2 Operational
Aviamotornaya Operational
St.Petersburg Operational
Tsvetochnaya-1 Operational
Tsvetochnaya-2 Operational
Dubrovka-1 Operational
Dubrovka-2 Operational
Dubrovka-3 Operational
Novosibirsk Operational
Svetlyi Operational
Tashkent Operational
Unicon Operational
Infrastructure Scheduled maintenance
Electricity Scheduled maintenance
Conditioning Operational
Network Operational
N+ Operational
Interfaces Scheduled maintenance
API Scheduled maintenance
Control Panel Operational
NTP Operational
Looking Glass Operational
Billing Operational
Website Operational
Mirror Operational
CLI Operational
DNS Operational
Third-party services Operational
Veeam Cloud Connect/Veeam Agent Operational
Cyber Backup Cloud Operational
VDS by Selectel Minor incident
Website pages Minor incident
Control panel Minor incident
API Minor incident
Moscow Minor incident
Saint-Petersburg Minor incident
External network Operational
Russia network Operational
Foreign network Operational
Selectel Mail service Operational
Control panel Operational
S3 Operational
RU-1 Operational
RU-3 Operational
RU-7 Operational
RU-6 Operational
GIS-1 Operational
KZ-1 Operational
UZ-2 Operational
ИИ-платформа Operational
AI router Operational
Token Factory Operational
Dedicated Inference Operational
Inference-сервисы Operational
ИИ-маркетплейс Operational
ML-платформа Operational
Хранение и обработка данных Operational
Trino Operational
Redash Operational
Hive Metastore Operational

Current incidents


Minor incident API готового облака 1С находится в режиме Только чтение. Пул ru-3.
[Issue]

Уважаемые клиенты.

В данный момент API готового облака 1С переведено в режим “Только чтение”(read-only) для пула ru-3.

Могут возникает ошибки при попытках создания/управления/удаления ресурсов готового облака.
Read-Only режим работает в рамках функционала кластеров и ИБ.

Профильный отдел уже занимается решением проблемы.

Приносим извинения за доставленные неудобства.

Minor incident Создание виртуальных машин в проекте VDS by Selectel недоступно
[Issue]

В настоящий момент создание виртуальных машин через панель управления и API в пулах Санкт-Петербург и Москва временно недоступно.

Наши инженеры уже выявили причину проблемы и работают над её устранением. Приносим извинения за возможные неудобства.

Scheduled maintenance Scheduled works on electrical equipment at location MSK-4 from 27-11-26 14:00 MSK to 27-11-26 16:00 MSK
[Scheduled]

27.11.2026, from 14:00 to 16:00, a scheduled monthly test of Dynamic Uninterrupted Power Supply No. 10 (DIPS No. 10) will be conducted at the MSK-4 location. This test ensures the uninterrupted power supply to Power Input No. 2 of Data Center Hall No. 14 (these are the outlet blocks/PDUs labeled “Power Input No. 2,” “UPS Panel 14.4, Power Input No. 2,” etc.).

As part of the test, the operation of the diesel generator set (DGS) within DIPS No. 10 will be verified.

The second power input of...

Scheduled maintenance Planned maintenance work at the Berzarina data center (MSK‑1, MSK‑2) from 18-11-26 22:00 MSK
[Scheduled]

On November 18 and 19, 2026, from 22:00 to 07:00 (UTC+3), power supply network modernization work is scheduled.

During this maintenance, power redundancy is expected to drop to the N+0 level.
Equipment shutdowns during the work are not expected.

We apologize for any inconvenience.

Scheduled maintenance Planned maintenance work on API RU‑1 from 10-11-26 12:30 MSK
[Scheduled]

On November 10, 2026, from 12:30 to 14:00 Moscow time, API maintenance work is scheduled in ru-1.

Scheduled maintenances


Scheduled maintenance Planned electrical infrastructure maintenance at the MSK-4 location from 30-11-26 08:00 MSK to 30-11-26 17:00 MSK
[Scheduled]

Scheduled works on electrical equipment modernization are planned from 08:00 30.11.2026 on 17:00 30.11.2026 (UTC+3). Due to this, a reduction in the level of power redundancy for server racks down to N+0 is expected. No equipment shutdowns are planned.

We apologize for any possible inconvenience.

Scheduled maintenance Planned electrical infrastructure maintenance at the MSK-4 location from 30-11-26 08:00 MSK to 30-11-26 17:00 MSK
[Scheduled]

Scheduled works on electrical equipment modernization are planned from 08:00 to 17:00 on 30.11.2026 (UTC+3). Due to this, a reduction in the level of power redundancy for server racks down to N+0 is expected. No equipment shutdowns are planned.

We apologize for any possible inconvenience.

Scheduled maintenance Scheduled maintenance on the backup infrastructure for a VMware-based public cloud from 03-12-26 10:00 MSK to 03-12-26 14:00 MSK
[Scheduled]

On December 3, from 7:00 to 11:00 AM UTC, scheduled maintenance will be performed on the backup infrastructure for the VMware-based public cloud.
During this period, backup and restore operations for virtual machines in the VMware-based public cloud will be unavailable.
All active backup and restore sessions will be interrupted.
We apologize for any inconvenience.

Scheduled maintenance Planned electrical infrastructure maintenance at the MSK-4 location from 04-12-26 23:00 MSK to 05-12-26 07:00 MSK
[Scheduled]

Scheduled works on electrical equipment modernization are planned from 23:00 04.12.2026 to 07:00 05.12.2026 (UTC+3). Due to this, a reduction in the level of power redundancy for server racks down to N+0 is expected. No equipment shutdowns are planned.

We apologize for any possible inconvenience.

Scheduled maintenance Scheduled Infrastructure Upgrade from 09-12-26 00:00 MSK to 09-12-26 05:00 MSK
[Scheduled]

On December 9, from 00:00 to 05:00 (UTC+3), we will perform a series of infrastructure upgrades to improve platform stability and reliability.

During this period, the control panel and some services may experience limited functionality.

We recommend scheduling scaling and other critical resource operations either before the maintenance begins or after it is completed.

Your resources will continue to operate as usual.

We will keep you informed of the maintenance progress and notify you...

Scheduled maintenance Planned electrical infrastructure maintenance at the MSK-6 location from 09-12-26 09:00 MSK to 09-12-26 12:00 MSK
[Scheduled]

Scheduled works on electrical equipment modernization are planned from 09:00 to 12:00 on 09.12.2026 (UTC+3). Due to this, a reduction in the level of power redundancy for server racks down to N+0 is expected. No equipment shutdowns are planned.
We apologize for any possible inconvenience.

Scheduled maintenance Planned electrical infrastructure maintenance at the MSK-6 location from 10-12-26 09:00 MSK to 10-12-26 16:00 MSK
[Scheduled]

Scheduled works on electrical equipment modernization are planned from 09:00 to 16:00 on 10.12.2026 (UTC+3). Due to this, a reduction in the level of power redundancy for server racks down to N+0 is expected. No equipment shutdowns are planned.
We apologize for any possible inconvenience.

Past incidents


Scheduled maintenance Maintenance on backup infrastructure from 27-11-26 10:00 MSK to 27-11-26 11:00 MSK
[Scheduled]

On November 27, from 10:00 to 12:00 AM UTC+3, scheduled maintenance will be performed on the Veeam backup infrastructure.
During this period, the portal vac.selectel.ru will be unavailable.
No impact on backup operations is expected.
We apologize for any inconvenience.

Scheduled maintenance Scheduled works on electrical equipment at location MSK-4 from 27-11-26 10:00 MSK to 27-11-26 12:00 MSK
[Scheduled]

On 27 November 2026, from 10:00 to 12:00, a scheduled monthly test of Uninterrupted Power Supply (UPS) System No. 9 will be performed at the MSK-4 location. This system provides uninterrupted power to Power Feed No. 1 of Machine Room No. 8.

The affected outlet blocks/PDUs are labeled as “Power Feed No. 1,” “UPS Panel 8.1, Power Feed No. 1,” etc.As part of the testing, the operation of the diesel generator set (DGS) within UPS System No. 9 will be verified.The second power feed to the...

Scheduled maintenance Обновление компонентов облака на базе VMware from 26-11-26 20:00 MSK to 26-11-26 23:59 MSK
[Scheduled]

В период с 20:00 26.11.2026 по 23:59 26.11.2026 (МСК) будут проводиться работы по обновлению компонентов облака на базе VMware в регионах Москва и Санкт-Петербург. Во время работ возможна недоступность управления датацентрами в панелях vcd.selectel.ru и vcd-msk.selectel.ru продолжительностью до 60 минут для каждого региона. Также в указанный период могут наблюдаться сбои в запланированных задачах резервного копирования виртуальных машин. Работоспособность и сетевая доступность виртуальных ма...

Incident & maintenance history
This page is automatically updated every 60 seconds