]

Build AI data centers faster.

Giga deploys AI data centers faster than anyone else with our in-house manufacturing, development, and powered land portfolio.

Image
Image
Image
Image
Image
Image
Image
Image
Image

what is GigaBase?

The GigaBase,
module by module.

GIGA'S DATA CENTER SYSTEM

GigaBase is our pre-engineered, scalable data center system that helps AI operators deploy compute capacity faster.

Image
Image
Image
Image
Image
Image
Image
Image
Image
  • 01
    GigaPod
    AI-01

    45-foot AI compute module with hot aisle containment, air-to-liquid cooling, and 4N/3 redundant power.

    GigaPod supports high-density liquid-cooled and low-density air-cooled racks and scales to 90 or 135 feet.

  • 02
    MV Switchgear
    M-01

    24.9kV or 35kV medium voltage module connecting and distributing power from the utility to the site with 2 incoming feeders and 10 feeder breakers.

  • 03
    UPS E-House
    E-01

    A 3.0 MW lithium-ion battery backup that keeps your compute online in the gap between utility interruption and generator response.

  • 04
    Power Skid
    E-02

    3.6 MVA transformers paired with 5,000A low-voltage switchboards that step down and distribute voltage to the site.

  • 05
    Diesel Generator Module
    DG-01

    3.3MW diesel generator providing 24-hour backup power when utility power fails. Includes Belly tank, radiator & enclosure.

  • 06
    4N3 Electrical Glue
    G-03

    Proprietary 5000A electrical interconnects that connect & distribute power between each module in the system.

  • 07
    Cooling Glue
    G-06

    Pre-engineered mechanical piping modules that connects the chiller loop to each GigaPod, delivering cooled water to the system.

  • 08
    Air-cooled Chiller
    M-02

    2MW Maglev compressor chiller that rejects system heat and feeds a closed cooling water loop to each GigaPod.

Full-stack

One partner. Every phase.

Most data centers are assembled from a chain of 12+ separate companies. Giga owns the entire value chain — origination, manufacturing, development, operations — under one roof.

01 / Land & Power

Powered Land

A large and growing portfolio of powered sites. Low-cost power markets. Lots of acreage. Strategic locations. Fiber access. High-voltage infrastructure available.

See Powered Land
Image
02 / Equipment
AI Infrastructure
02 / Equipment

AI Infrastructure

We manufacture all the infrastructure between the utility and the rack — transformers, switchboards, and power and cooling modules.

See AI Infrastructure
Image
03 / Construction
Site Development
03 / Construction

Site Development

We build build-to-suit data centers using our own infrastructure or on behalf of customers — on their land or ours. Flexible deal structures. Faster, cheaper, and more cost-certain than the multi-vendor norm.

See Construction & Development
Image
04 / Operations
Colocation
04 / Operations

Colocation

We offer colocation data centers on our own powered land. Purpose-built for high-density GPU deployments and operated by the same team that built them.

See Colocation
Image
American Innovation

Expanding the grid across the U.S.

Our vertically integrated approach powers Giga Energy's factories, offices, and energized sites around the country.

Image
ImageImage
Project Royse40 MW
Image
ImageImage
Project Mode32 MW
Image
ImageImage
Project BFD23 MW
Image
ImageImage
Project Wise-East25 MW
Image
ImageImage
Project Catalyst40 MW
Image
ImageImage
Project Win-East25 MW
Image
ImageImage
Project Houston MWGiga Energy Factory
Image
ImageImage
Project Houston MWGiga Energy Office
Image
ImageImage
Project Long Beach MWGiga Energy Factory
Image
ImageImage
Project San Francisco MWGiga Energy Office
Image
ImageImage
Project Able40 MW
Image
ImageImage
Project Manning19 MW
Image
ImageImage
Project Wallis20 MW
Image
ImageImage
Project Stockton10 MW
Image
ImageImage
Project Lavon40 MW
Image
ImageImage
Project Brazoria17 MW
Image
ImageImage
Project Mustang20 MW
Image
ImageImage
Project Wildcat10 MW
Image
ImageImage
Project Jimmy10 MW
Image
ImageImage
Project Macalester20 MW

INFRASTRUCTURE

Custom AI energy infrastructure, delivered faster.

We’ve delivered more than 6.5 GW of transformers, switchboards, power, and cooling AI infrastructure built in Houston, TX and Long Beach, CA.

  • Fast lead times on in-stock inventory & made-to-order options
  • Flexible engineering for custom projects
  • Responsive US-based support & service

Transformers

3-phase padmount and substation transformers. Shop in-stock inventory or get a quote for a custom build.

Image

AI Power and Cooling

Whitespace, hydro-cooled AI compute modules that drop into data center halls.

Image

Power Distribution

Highly customizable modular power distribution solutions built and delivered on fast turnarounds.

Image

Speed doesn't take shortcuts.

Powering hundreds of customer sites globally — the right way.

6.5+

Total GW

826+

Switchboards sections

1406+

Transformers Built

18

Sites Operational

Site Origination & Development

Experienced site developers with MWs.

We develop AI-ready data center sites within nine-month timelines. A vertically integrated supply chain, including our own factories and general contractor teams, allow us to do what no one else can.

Site Development & Origination
175+ MWs

Data centers built

500+

MWs Pipeline

inside a giga data center
man working on giga equipment outside
sun rising on giga data center
Image

POwer Markets

Earn $60-80k per MW with power market optimization

The Giga Power Systems platform maximizes revenue potential for flexible data center loads.

Get A Demo
  • Up to $80k per MW in SPP
  • Built for site-level economics
  • Proven across our 175 MW of flexible-load sites

customer stories

Satisfied Customers Across the Country

Publicly Traded AI Hyperscaler

“Giga's 7-week turnaround and custom engineering allowed us to scale up GPUs quickly.”

a switchboard on a light background

Midwestern Data Center on a Tight Timeline

"The equipment not only arrived on the tight timeline, but we've been extremely satisfied with the quality since the site was energized."

Image

Data Center in Texas

“Our electricians let us know multiple times how much they prefer the GIGA equipment to anything else they have installed. It’s the best of any single piece of infrastructure we ordered.”

Image

Let’s build what’s next together.

Image
70.9
"
82.7
"