Level Up 31 will bring elevated efficiency on I-465 and US 31 between Indianapolis and Carmel, Indiana

By The Numbers

Learn more about the forecasted traffic volumes with anticipated growth of the area.

0
Vehicles Per Day Traveling
US 31 Both Directions (2025)
0
Vehicles Per Day Traveling
US 31 Both Directions (2045)

Traffic Overview

Upcoming Short-term Closures

Monday, June 8

  • Eastbound I-465 will be reduced to 1 lane from mile marker 30 to 31.5 from 9 p.m. Monday to 6 a.m. Tuesday

Tuesday, June 9

  • Westbound I-465 will be reduced to 1 lane from mile marker 32 to 30.5 from 9 p.m. Tuesday to 6 a.m. Wednesday

Wednesday, June 10

  • Temporary closure of the westbound I-465 exit ramp to northbound U.S. 31 and southbound Meridian Street from 9 p.m. Wednesday to 6 a.m. Thursday. The detour for this route is to continue westbound on I-465, exit at Michigan Road, proceed southbound on Michigan Road, re-enter I-465 eastbound, and exit on to northbound U.S. 31 or southbound Meridian Street.

Extended Closures

Through fall 2026

  • Closure of southbound Meridian Street between 106th Street and 96th Street
  • Closure of 106th Street exit ramp to southbound Meridian Street
  • Temporary traffic shift on I-465 ramps to U.S. 31 northbound 
  • Closure of northbound U.S. 31/Meridian Street ramp to 106th Street 
  • Closure of 106th Street ramp to northbound U.S. 31
  • Northbound Meridian Street between 96th Street and the I-465 interchange will be reduced to 2 lanes. The left lane will lead to U.S. 31 northbound and 106th Street and the right lane will lead to the WB I-465 ramp

Level Up 31 Happening Now

Phase 3 – Spring to late Fall 2026

This phase includes widening eastbound and westbound I-465 ramps to northbound U.S. 31, along with additional improvements to accommodate for the rapid regional growth and number of vehicles using the interchange.

During this time, a temporary traffic pattern shift will be in place along U.S. 31/Meridian Street from 106th Street to 96th Street. Northbound traffic will utilize the existing southbound U.S. 31/Meridian Street lanes by following posted signs. Traffic will switch back to the existing northbound lanes just south of 106th Street.

Phase 3 extended closures:

Phase 3 – Temporary Traffic Pattern

Phase 3 – Detour for SB Meridian Street

Phase 3 – Detour for NB Meridian U.S. 31 to 106th Street

Phase 3 – Detour for 106th Street to NB U.S. 31

The New Look of Level Up 31

Map reflects the reconfigured traffic patterns and added lanes completed by 2027.

Image

Project Overview

Level Up 31 is the interchange modification project for US 31 and I-465 in Hamilton County. It includes the modification of the I-465/US 31 north interchange, seven bridge deck overlays, and related work on US 31 from I-465 to 116th Street in Carmel. The project will increase capacity for west to north and east to north movements to create better traffic flow and enhance safety.

Construction Schedule

Crews are adding capacity and increasing safety and traffic flow in the four-phase project that concludes in late 2027.

Completed

Phase 1 – Fall 2025 to Spring 2026

Completed

Phase 2 –
Spring 2026

happening now

Phase 3 – Summer 2026 to Winter 2026

Upcoming

Phase 4 – Fall 2026 to Summer 2027

Never Miss An Update

Email Updates

Sign up to receive Level Up 31 construction updates delivered directly to you via email.

Text Updates

Sign up to receive Level Up 31 construction updates delivered directly to you via text.

Location