Miller Avenue Improvements Project
Utility and transportation updates to Miller Avenue
Utility and transportation updates to Miller Avenue
Reestablishment of stormwater detention and improvement of stormwater quality.
A study to learn about opportunities to improve safety, increase mobility options, and support land use density.
Traffic calming project in the Redwood, Rosedale and Springbrook Neighborhood
Design and replace the existing bridge
See where and what type of development is happing in the city
In the summer of 2023, the Ann Arbor DDA began work on creating a new Development and TIF Plan.
A long term study being conducted across the city in neighborhoods that have gravel roads and are experiencing drainage issues, localized flooding, and standing water.
parking lot repavement
A full street reconstruction, which includes repaving travel lanes, widening sidewalks, providing new lighting and pedestrian amenities, and new underground utilities.
A plan to guide growth and land use decisions
Create a 0.8 mile-long All Ages and Abilities (A3) bike priority corridor
The project will upgrade traffic signals at 15 locations citywide.
Utility improvements to increase the city's sewer system capacity
Proposed six-story residential building
Oak tree removal
two residential parcels request rezoning to R2A
Rezone to C2B to develop 6-story residential building
rezoning and additional story added to existing building
St Paul Lutheran School library addition
rezone request and proposed redevelopment for housing
rezoning and parking expansion to install bioretention area
Seven-story hotel
Expansion of existing apartment building
Residential high-rise
Site plan to construct 15 new buildings in downtown-style development.
Improvements that align with the city's Park ADA Transition Plan
Renovation of park playground
The park receives a new splash pad and update playground
Visioning initiative for rebuilding the farmers market
Feedback on how to activate West Park
Exploration of how to meet pickleball demand
Construct a pedestrian tunnel to connect Bandemer Park and Barton Nature Area
Upgrade playground equipment
This project will replace aging drinking water pipes, improve stormwater infrastructure to improve water quality, and resurface roads in poor condition.
A federally awarded grant that supports project elements such as: speed management, quick build and near miss video analytics system.
Ann Arbor’s Strategy to Promote a thriving local Circular Economy, crafted by residents, businesses, and circular economy experts.
The existing 8" water main, installed in the '60's, will be replaced with a new 12" water main, which will improve water flow to surrounding properties.
A project to enhance safety and mobility options as outlined in the city’s Moving Together Towards Vision Zero
A project to enhance safety for all roadway users of the North University Avenue and Thayer Street corridors.
Road, water utilties, and stormwater improvements on Arbordale and Sherwood Street and Sherwood Court
Utility upgrades, road resurfacing, and an updated streetscape
Mixed-use building containing ground floor retail and 330 apartments
A city wide project to improve safety, reduce vehicle speeds, and enhance multimodal connectivity along arterial streets
Expand Forest Cove Condominiums
Construction of a new sorority
New sidewalks will be installed along missing gaps on Apple and Pear Wood Drive.
The creation of the city's first comprehensive stormwater plan
annex a site in Scio Township, and zoning to planned unit development for multifamily residential
Construct a new 19 story mixed use residential building with ground floor retail.
Rezoning from planned unit development to construct affordable housing and retail.
Village of Ann Arbor
Rezoning to build 30 townhomes
Proposed 8-story residential building
Proposed site plan to redevelop four parcels to construct a 20-story apartment building
A proposed seven-story building with 38 residential condominium units.
Annex and rezone four vacant parcels (6.3 acres) to multi-family
13.8-acre parcel development of a mixed-use project along the Huron River
Proposed rezoning to the downtown core district
apartments and ground floor commercial
Rezone Arbor Springs from planned unit development to multiple-family district, and a site plan to demolish the existing buildings and construct an apartment building
Rezone the vacant 4.2 acre parcel from Office to Multiple-Family Residential
The lime lagoon used by the Water Treatment Plant is nearly full and storage space is needed.
Improving multi-family residents’ access to composting.
Replacement of an aging 12-inch transmission water main that has a history of breaks.
To provide the highest quality drinking water, it's critical for the city to review and evaluate the conditions and capacity of the system on a regular basis.
This project is being done to address the low water pressures on the west side of South Maple Road from Breckenridge Drive to Country Village Court.
Implementation of speed management on Gladstone Avenue from Packard to Candlewick
Implementation of speed management on Independence Boulevard from Packard to Manchester
Resurfacing of Washtenaw Drive from west end near South Huron Pkwy to Pittsfield Boulevard.
Road resurfacing and bike lane improvements on South Fifth Avenue from East William Street to East Madison.
Traffic calming project on Bird Road from Newport Road to Huron River Drive.
Traffic calming project on Henry Street from Golden Avenue to Packard Street.
Traffic calming project on Arella Boulevard from Stadium Boulevard to Pauline Boulevard.
Traffic calming project on Mershon Drive from Scio Church Road to Delaware Drive
Traffic calming project on Warden Avenue from Jackson Avenue to Dexter Avenue
Traffic calming project on Carmel Street from Easy Street to Towner Boulevard.
Traffic calming project on Fulmer Street from Miller to Foss.
Traffic calming project on Baldwin Avenue from Packard to Stadium
Traffic calming project on Manchester Road from Buckingham to Needham
Traffic calming project on Grandview Drive from Jackson to Dexter.
A study to learn more about a few long-standing prospective sidewalk projects to determine their viability and community support
A strategic plan and budget for sanitary sewer system improvements necessary to adequately transport wastewater flows to the wastewater treatment plant.
A full road reconstruction project
Address safety concerns of the Harding and Wallingford intersection as well as the installation of a new water main and sanitary sewer
Installation of four new crosswalks
New sidewalks will be installed along missing gaps on Dexter Road
Replacement of aging drinking water pipes, improvement of stormwater infrastructure, and resurfacing of a road in poor condition.
A 2025 project to replace aging asphalt, repair storm drains as well as segments of curb and gutter, and upgrade ADA non-compliant curb ramps.
An annual, city-wide survey used to gather feedback on public's experience and satisfaction with the Ann Arbor transportation systems.
Traffic calming project on Doty Avenue from Arborview Boulevard to Dexter Avenue
A collaborative elective course between the city and Community High School designed to educate and empower young minds about local governance and civic participation,
New sidewalks will be installed to close gaps on Barton, Brockman and Crestland Road.
A grant funded project that will allow the city to transition DTE streetlights from High Pressure Sodium (HPS) to LED lights.
Sanitary sewer improvements between LynAnne Court and Arbana Drive
Various small and large scale utility projects around the City of Ann Arbor
Road resurfacing and watermain improvements on Pauline Boulevard
Traffic calming project on Brandywine Drive from Yost Boulevard to Packard Street
New sidewalks will be installed to close missing gaps
Rehabilitation of the East Medical Center Drive Bridge over the Amtrak Michigan line
Installation of a public water main and sanitary sewer main to serve each residence.
Traffic calming project on Traver Road from Barton Drive to John A. Woods Drive.
Installation of a new water main and an ADA compliant sidewalk ramp, as well as street resurfacing and pavement marking improvements.
Improvements to the stormwater, drainage and drinking water infrastructure currently serving the Pittsfield Village area
The Barton Dam project runs through June 2027 and will include stabilizing a berm on the downstream slope of the right embankment for seepage and stability concerns.
Mass grading project to reconfigure intersection into a roundabout intersection as well as the installation of new water main, sanitary and storm sewer.
The Mural Design Winner is Humphrey Trumpey!
Have questions or want to learn more about a project, contact us below:
| Phone | 734.794.6000 |
|---|---|
| Website | www.a2gov.org |
| In writing | 301 E. Huron St. |