Pinned
Wow! That is very surprising to see already. Certainly moving a lot faster than I expected.
The team has been busy transporting all modules that were removed from the Vehicle Access Tower back to the pad to prepare for re-stacking. We designed and installed floors, pneumatics and electrical panels, and backbone piping on the modules. And we're moving the elevator to the




