Log inSign up
Fluidstack
200 posts
Fluidstack profile banner
@fluidstack

Fluidstack

@fluidstack
Infrastructure for Abundant Intelligence
New York
fluidstack.com
Joined November 2018
27
Following
4,996
Followers
RepliesRepliesRepostsRepostsMediaMedia

Log in or sign up for X

See what’s happening and join the conversation

Continue with phone
or
Log in with username or email
Terms·Privacy·Cookies·Accessibility·Ads Info·© 2026 X Corp.
  • Pinned
    @fluidstack
    Fluidstack
    @fluidstack
    Jul 20
    In January, Fluidstack raised an $830M Series A at a $7.5B valuation, led by Situational Awareness, with participation from world-leading investors. Fluidstack builds infrastructure for the leading AI labs - our goal is to be the fastest on the planet at deploying hundreds of
    Image
    107
  • @fluidstack
    Fluidstack
    @fluidstack
    Sep 2
    4 more hours until we open the doors, still accepting a few last minute applications. Join us for an evening on a historic battleship in LA. Apply here: luma.com/sfy1kfp5
    @fluidstack
    Fluidstack
    @fluidstack
    Aug 31
    Two days out. Steel & Silicon LA, this Wednesday, aboard the USS Iowa. We build modular data centers on a line, at rate. We're hiring the engineers who know what that takes. Founders and hiring managers in the room. Sept 2 | Los Angeles Apply: luma.com/sfy1kfp5
    Image
    3
  • @fluidstack
    Fluidstack
    @fluidstack
    Aug 31
    Two days out. Steel & Silicon LA, this Wednesday, aboard the USS Iowa. We build modular data centers on a line, at rate. We're hiring the engineers who know what that takes. Founders and hiring managers in the room. Sept 2 | Los Angeles Apply: luma.com/sfy1kfp5
    Image
    7
  • @fluidstack
    Fluidstack
    @fluidstack
    Aug 28
    Steel & Silicon: Los Angeles. Fluidstack is leading Anthropic's $50bn compute buildout, one of the largest infrastructure projects in US history. We're building modular datacenters the way LA built aircraft: on a line, at rate. Hiring structural, electrical, and mechanical
    Image
    6
  • @fluidstack
    Fluidstack
    @fluidstack
    Aug 21
    Fluidstack is hiring the team that will design and build modular data center infrastructure in-house. Data centers take years to build because each one is a construction project. We're engineering them as factory products instead, built on a line in Phoenix, so a data center
    Image
    5
Advertisement
Advertisement