Wednesday, 22 January 2014

Activity at Lambing Flat!

After an entire year of very little activity at Lambing Flat, a resumption of work on the extension has motivated me to bring things up to date.

When my last post was made (in November 2012!) I had just started work on a major extension at the 'down' end of the yard, where the old Murringo fiddleyard used to be (see drawing in previous post). Even with the addition of the second fiddleyard (shown as 'Cowra' on the drawing in the previous post, but since swapped over to be regarded as the 'Demondrille' fiddleyard, because it made more sense geographically), I was still very short of strorage space, plus I was finding that most of the activity was taking place in the fiddleyard as I made up new trains and that most of the rolling stock was usually in the fiddleyards and could not be seen!

I decided that it was time to build a new section and extend the layout a little further. As my favourite activity is shunting trains, I decided that, rather than make a new fiddleyard and have everything still happening 'off stage' and with most of the models hidden away, I would make this new section a marshalling yard, allowing me to shunt 'on stage' and allow more displaying of my rolling stock.

The rationale is that during WW2, traffic grew beyond the capacity of Lambing Flat itself to reverse trains running between Demondrille and Cowra on the cross-country line (as happened in real life at Binnaway, hence the addition of extra marshalling sidings at that location in the 1940s), so new marshalling sidings were laid out just out of town. Also, rather than that end of the line proceeding to the terminus at Murringo, as was the previous scenario, the assumed 'real life' orientation of the station has been turned around and the line now proceeds to Temora (replacing the Cootamundra - Temora line, which wasn't built in my scenario). That explains why the fiddleyard names have swapped, as well.

Now, instead of reversing in Lambing Flat yard, trains on the cross-country line proceed through the station to the New Yard, where they terminate. The yard shunter releases the train locomotive, which then runs light to LF to turn and await its next duty. The yard shunter then shunts the train out, removing any traffic for destinations towards Temora and adding any outbound traffic up to the length limit, then places the loading on a convenient brakevan to make up a new train. When this is done, the train engine returns tender first from LF and attaches to the new train, does the brakes and departs when a 'path' opens up in the heavy traffic on the line (there is usually another train waiting in LF's yard for entrance to the New Yard). Any traffic for the Temora direction is placed in a convenient siding and after a while is assumed to be arriving traffic that is then carded for LF, Cowra or Demondrille and placed on an appropriate train.

Below is a photo log of the construction that occurred in November - December 2012. 


Image
The extension at what is now the western end of the Lambing Flat's yard begins on 6 November 2012. The old 'Murringo' fiddle yard is no more and the support structure for the new corner module is almost complete (the 2" x 1" at far left is temporary while everything dries). The storage shelf that covers the entire layout has been extended, as has the Masonite valance that keeps everything looking tidy! The heavy card backscene has also been extended.


Image
Another view, taken on 6 November, showing where the corner module will go. Where I am standing will be the 'New Yard'. The backscene boards are temporarily pinned while the glue dries. I still have to 'fair' the curved section of the old backscene into the new one before I can paint it. The new backscenes is vertical, as I do not regard the curved over backscenes behind the station to have been a complete success visually and they are a total nuisance when photographing.


Image
Progress by 7 November. The backscene has been roughed in and the basic module completed. I still have to fill and smooth off the backscene before painting it and the module has to have the profile board cut to size and the track supports cut and raised to accomodate the various levels once I have finalised the trackplan. I originally intended to remove the current fabricated steel 60ft turntable and replace it with a 60ft Sellers cast iron table, situated in the left foreground, with a Uneek roundhouse behind and the current turntable access road extended to the turntable with extra roads to accommodate what was to have been a much larger loco depot. However, a change in thinking has postponed that modification till after I have finished the rest of the New Yard. The module is a straightforward ply box, just like all the other modules that make up LF.


Image
By the 10 November the bottom half of the module for the New Yard had been constructed, once more a simple ply box. This one has its own folding legs, with castors attached for easy wheeling around the workspace.


Image
By the 12 November the cover had been mostly completed, a light pine frame with thin ply roof and MDF valances, with just one section of the front valance and the 'slide in' backscene to go in, plus lighting, before tracklaying can begin in earnest. A couple of buildings have already appeared to help with planning.


Image
Another shot from 12 November, with track planning underway, using lengths of flexible track and printed out Peco code 75 turnout diagrams. The track is all Peco code 75, handlaying track is for much younger and more patient people now, as far as I am concerned! The track plan is all based on good NSWGR practice.


Image
Progress by 18 November. The valances have been completed, filled and sanded ready for painting. The backscenes have been installed and preparation for painting is advanced. The lighting has also been installed. The corner module has been lit by adding another fluoro, like the rest of LF (top photo), but I decided to experiment with these new-fangled LED strips for the 'New Yard' module (bottom picture). I'm quite impressed with the results, extremely quick and easy to install and a very good level of lighting. There is only one row in this photo (I later added a second) as the light level seemed a little lower than I like. I now had all the track I needed and once I took delivery of a couple of Cobalt point motors, track laying commenced.


Image
By 3 December 2012 the connecting track between the existing main line at LF and the New Yard entrance turnouts had been laid and 'tested'. The very first loco to run under its own power on the extension, 5303, stands at the entrance to the New Yard.


Image
By 9 December 2012, the trackplan had been finalised and the track laid out, ready to secure once I had installed some more point motors. (The main line is permanently fixed with point motors installed, but the rest of the yard isn't yet.) In the scenario, the New Yard has been laid out adjacent to Wirrimah, the first intermediate goods siding out of LF. The original siding is to the left, while the New Yard is to the right.


Image
By 13 December 2012, all the track had been laid and all but two point motors installed (I ran out and took a while to get some more, then, with one thing and another, they didn't get installed till last week!) I used Cobalt electric 'stall' motors on the main line where crossovers and turnout/catchpoints had to move in unison, with Blue Point manual turnout 'motors' in the yard where turnouts move individually. The next step was to wire it all up and get it working. The track on the right is the main line, with Wirrimah's goods siding in the distance. The crossover allows entry into the yard and the 'nest' of sidings at the top left. The track parallel to the main line on the left bottom is the shunting neck, which reaches back towards Lambing Flat, but isn't connected to it. The loop siding on the left is the Repair Road.

Image
By 21 December, the wiring had advanced sufficiently so that the new section (except for the repair siding, which was spiked over 'out of use' until some more point motors could be obtained) was operational. Here we see the Official Train, comprising varnished TAM and Tuscan and russet AM sleeping cars, headed by dirty green 3240 and trailed by a Tuscan and russet MHO, as befitting the late WW2 period of construction, brings some 'brass' from the 'big smoke' to inspect the new works. As you can see, 'Construction Branch' is still well and truly in possession!

Image
Shortly after the shot above, the very first goods train to use the new facilities enters the New Yard. Hauled by 5262, this mixed goods had arrived from Cowra. Yard shunter, 5303 (which really should be facing towards the yard) waits to deal with the train.


Image
Yard pilot, 5303, has shunted the incoming train to one of the storage sidings and now stands in the departure road with the brakevan off the train. In the background, 3240 has turned and is getting read to haul the Official Train back towards Sydney. No doubt, there will be other inspections made on the way and the Traffic Inspector's note book will be kept very busy!

Once everything was operational, that was pretty much it for a year! I ran trains, thoroughly testing the trackwork and making adjustments to the operating patterns, but not much else. However, the urge to do some more hit a week or so ago, so there may be some more updates soon!










Friday, 9 November 2012

Back Creek Junction and the line to Cowra, developments at Lambing Flat, 2012.

Image

Once Lambing Flat was re-erected in its current home in 2003, other than maintenance and the addition of the occasional minor detail, nothing much changed, other than the addition of DCC and more rolling stock. The track plan was as shown below, very little changed from its Burwood manifestation, other the deletion of the 'south curve' due to its excessively tight (approx. 600mm radius) curve and substitution of a much shorter fiddle yard at that end. 

Image
With this short fiddle yard (no more room in the garage that end) LF could no longer be operated as it was in Burwood, an intermediate through station, plus I wanted to have more happen in the station than just trains crossing and occasionally shunting the yard. I had always liked the operations carried out at Binnaway in NSW's north west where the main traffic on the Dubbo - Werris Creek line came in and exited the yard from the same end, while the branch traffic to and from Gwabegar passed through. I resolved that the main destinations for traffic on the line, 'Cowra' and 'Demondrille' would be the same fiddle yard, meaning that all trains moving between those points would have to reverse in the yard, while the small fiddle yard at the bottom would become the branchline terminus of 'Murringo'. This resulted in most traffic originating the large fiddle yard (at the top), running into the yard, reversing the brakevan and changing engines, then returning to the same fiddle yard (the junction was assumed to be 'beyond the layout'). Occasionally a 'pick-up' would run with traffic for Lambing Flat itself and would spend time shunting the yard and a (usually mixed) train would run 'through' to 'Murringo', connecting with a passenger train running on the 'cross-country' line. This operating pattern worked well for many years, but as more rolling stock was acquired the fiddle yard became very crowded, so I resolved to build a new fiddle yard and move the junction 'on stage', allowing a new scenic section to be constructed, some 20 years after the last extension of the layout (LF is a rural railway, things move slowly!)
 
The basic fiddle yard and baseboard was constructed and made operational in early 2011, but it took till the beginning of 2012 before any progress was made on the scenery. (With playing soccer during the winter and a certain magazine taking up most of my time and energy, progress on the layout can take some time...)
 
By 5 January 2012, this was the scene on the extension.
 
Image
 
The shelf over the extension had been erected, profile boards fitted and a start made on constructing the scenery. The track plan now looked like this:
 
Image
 
This photo shows a 'panoramic' view of the layout, showing how the new section fits in.
 
Image
 
Image
 
Scenery construction is quite conventional with carved styrofoam on a baseboard of particle board.
 
Image
 
Image
 
The concept of the new section is that the line has been cut alongside a creek, crosses the creek and then disappears into a rock cutting, which hides the entrance to the fiddle yard. The bridge is a Hawksmoor 'Large Railway Culvert' kit, obtained from Casula Hobbies (I reviewed it in AMRM Issue 285, December 2010).
 
This is the junction of the new line to the old layout, conveniently situated in the small extension I was able to make between the level crossing and the turnout to the mill when the layout was first re-erected in 2003.
 
Image
 
I'm getting too old and impatient to scratchbuild track these days, so the track is standard Peco code 75 'finescale'. The signal box is a temporary one, while the ash buffer stop is a Uneek whitemetal item.
 
By the next day (6 January) the 'ground' had been added by the conventional method of spreading plaster, tinted with powder colour, and the rock faces cast in plaster using the very traditional method of crumpling up aluminium foil and using it as a mould.
 
Image
The four equally spaced and shaped rock faces along the cutting looked a little 'artificial' (I forgot the 'rule of evens') so after this photo was taken the cutting was altered.
 
By 9 February some progress had been made on painting the scenery, with the rock faces painted using artist's acrylics in an attempt to reproduce the 'look' of the rock outcrops visible just to the south of Cootamundra, a scene that had always fascinated me.
 
Image
 
The rock faces, painted with a combination of artist's acrylic colours and various techniques of application in an attempt to evoke the prototype scene below.
  
Image
 
Two photos of the rock outcrops just south of Cootamundra, 6 November 2011.
 
Image
 
I haven't quite got the colour of the lichen right, but it is getting there! The level crossing detail is starting to appear with a Uneek stock guard and the level crossing signs (SJM kits) installed.
 
Image
P class 3324 rolls towards the junction with a goods train, mainly consisting of RU wheat hoppers, on 9 February 2012.
 
Image
A couple of days later (11 February) and the first layer of ground cover had been added (dyed sawdust), a start made on the vegetation in the creek and the first trees starting to appear.
  
Image
By 16 February the colours of the rocks had been 'adjusted', the fences were in and the detail such as trees, bushes, weeds etc. were starting to appear. The second stock guard (also Uneek) has been added and the beginnings of the home signal temporarily in place.
 
Image
Another view of the scene with an ancient (visiting) Berg's 30 class tank passing on the school train.
  
Image
By 6 March a lot of extra scenery detail had been added, courtesy of Woodland Scenics and miniNatur!
 
Image
The home signal had also been completed and temporarily added to the scene.
 
Image
The grass tufts and other material available from miniNatur allow a lot of fine scenic detail to be added quickly.
 
Image
More scenery, including some nice 'Patterson's Curse' using miniNatur material. The home signal is a slightly modified Uneek casting that has been made to work.
 
Not much was done between March and September (soccer season!), but during October a few more items were completed, some of which are shown below and some of which will be detailed in future posts.
 
Image
More scenic detail, this time a Uneek horse cart that has lost a wheel and been abandoned near the creek.
  
Image
A 'panoramic' view of the junction taken on 9 November 2012. The junction has been named 'Back Creek Junction', a very typical Australian name for a creek and also the name of a real creek in my home town, Young NSW, which is where Lambing Flat is supposedly set. 
 
Image
A closer view of the junction as it is on 9 November 2012. The junction bracket and the new signal box have been installed and final detailling of the scenery is proceeding.
 
However, the focus of new construction has now moved to the other end of the layout...
 Image
 
More to come...