1. X
  2. Ryan Singer
Log inSign up
Ryan Singer
1,466 posts
Ryan Singer profile banner
user avatar

Ryan Singer

@rjs
Product end-to-end. Creator of Shape Up. Prev: 37signals. [email protected]
Global
ryansinger.co
Joined November 2007
24
Following
51.7K
Followers
RepliesRepliesArticlesArticlesMediaMedia
  • user avatar
    Ryan Singer
    @rjs
    Aug 20
    This is why architects use very small scale models.
    user avatar
    Ryan Singer
    @rjs
    Aug 20
    To "see" architecture, in code or buildings or whatever, requires seeing with your mind and not your eyes. The eyes see a million details that are not the architecture. Maybe that's why "design", "modeling" etc are more senior tasks. Because you have to see the macro among all
  • user avatar
    Ryan Singer
    @rjs
    Aug 20
    To "see" architecture, in code or buildings or whatever, requires seeing with your mind and not your eyes. The eyes see a million details that are not the architecture. Maybe that's why "design", "modeling" etc are more senior tasks. Because you have to see the macro among all
  • user avatar
    Ryan Singer
    @rjs
    Aug 19
    Yes. "State management" is a red flag that an intentional architecture and data model are missing.
    user avatar
    Devin Jameson
    @devinjameson
    Aug 19
    In frontend we have this strange term “state management”. “We’ll reach for a state management solution when things get complicated.” Weird way to approach the conceptual core of your program. Why not state modeling? Or really, application modeling? And why not model it
  • user avatar
    Ryan Singer
    @rjs
    Aug 15
    Yes
    user avatar
    Aliaksandr Valialkin
    @valyala
    Aug 12
    This basically our internal and external AI policy: don't waste others' time by providing them unverified AI output. Verify it on yourself and remove all the slop before providing the information to others. docs.victoriametrics.com/victoriametric…
  • user avatar
    Ryan Singer
    @rjs
    Aug 14
    In the early days at Basecamp, I learned that “project management is communication.” The addition to it is this: project management is design. Everything depends on the actual design of the change. Scope, timing, cost, performance. Who needs to be involved and when. Whether

Log in or sign up for X

See what’s happening and join the conversation

Continue with phone
or
Log in with username or email
Terms·Privacy·Cookies·Accessibility·Ads Info·© 2026 X Corp.
Advertisement
Advertisement