Contact Sales & After-Sales Service

Contact & Quotation

  • Inquire: Call 0086-755-23203480, or reach out via the form below/your sales contact to discuss our design, manufacturing, and assembly capabilities.
  • Quote: Email your PCB files to [email protected] (Preferred for large files) or submit online. We will contact you promptly. Please ensure your email is correct.
Drag & Drop Files, Choose Files to Upload You can upload up to 3 files.

Notes:
For PCB fabrication, we require PCB design file in Gerber RS-274X format (most preferred), *.PCB/DDB (Protel, inform your program version) format or *.BRD (Eagle) format. For PCB assembly, we require PCB design file in above mentioned format, drilling file and BOM. Click to download BOM template To avoid file missing, please include all files into one folder and compress it into .zip or .rar format.

PCBSync · Assembly engineering & project planning

BOM List for PCB Assembly: Fields That Identify the Build

Create a bill of materials that connects each fitted component to its location and approved identity. Distinguish a manufacturing BOM from a simple shopping list.

Prototype through production · scope and schedule confirmed after file review

Dense assembled board with fine-pitch components and multiple I/O connectors.
Dense assembled board with fine-pitch components and multiple I/O connectors.
At a glance: A PCB assembly BOM identifies what is fitted, where it is fitted and which approved part may be used for each build variant.
Prepare a clearer project request

BOM List tools

BOM List workbench

PCBSync Engineering Tools · no account required · calculations run in your browser

Mark what you have prepared

Keep the result or download the specification you want to discuss, then submit the enquiry on Contact. Tool inputs are not transferred automatically.

Continue to Contact →
Match the scope to the decision

BOM List: requirements that change the build

Decision / stageWhat to defineEvidence or next action
IdentityManufacturer and complete MPNAvoid ambiguous purchasing descriptions
PlacementDesignators, footprint and fitted quantityReconcile against the assembly layout
ControlRevision, variant, DNP and alternativesMake the approved configuration explicit
Practical engineering and purchasing guidance

Plan the work before releasing the files

Give each field a clear purpose

Reference designators identify component positions. Quantity states how many are fitted per assembly. Manufacturer and full part number identify the approved device. Description and footprint help reviewers detect inconsistent or ambiguous entries.

A supplier stock code can help purchasing, but it is not a substitute for manufacturer identity. Keep distributor references separate so a supplier change does not silently change the engineering definition of the part.

Try a two-row BOM check

Use sample values to see how designators, fitted quantity and DNP interact. Row 2 is optional and can reveal duplicate designators across rows. This checks text fields only; it does not verify a part, footprint, stock level or substitute.

Example row 1
Example row 2 (optional)

No checks run. Enter individual references; ranges such as R1–R5 are intentionally not expanded.

Read the CSV example and quantity convention
Assembly,Release,Variant,Designators,FittedQtyPerBoard,Population,Manufacturer,MPN,Footprint,ApprovedAlternative,Notes
EXAMPLE,B,Base,"R1,R2",2,Fitted,[manufacturer],[approved MPN],Resistor_0603,,Illustrative row only
EXAMPLE,B,Base,R3,0,DNP,,,Resistor_0603,,Intentionally not fitted

The example uses an explicit fitted quantity column, so DNP is zero. Some supplier templates count design positions and carry population status separately: map the column semantics before import. Quoting a BOM does not approve substitutions.

Represent DNP and variants explicitly

State do-not-populate positions and variant-specific changes in a controlled way, including options being evaluated during prototype PCB assembly. Do not leave a missing BOM row as the only indication that a position should remain empty.

Check that the quantity agrees with the listed fitted designators for the chosen variant. Distinguish one-board usage from procurement quantity so a production multiplier is not accidentally applied twice. For budgeting, use the BOM cost estimator with the planned procurement quantities and obtain current pricing from the suppliers. Use the BOM and placement reconciliation to confirm the fitted count before calculating purchasing quantities.

Add the purchasing context without losing control

For turnkey PCB assembly, include supply ownership, approved alternatives and notes for critical or programmed devices where needed. Keep proposals separate from approved substitutions and retain revision history for changes. For repeat builds under an electronic contract manufacturing agreement, define who approves substitutions and releases each BOM revision.

Before requesting PCB assembly, compare the BOM with placement data and assembly drawings. The readiness tool records known gaps but does not inspect your spreadsheet or certify a match. Different files may have different revision identifiers; the approved release manifest must map them to the intended assembly configuration. Retain the approved records in the PCB build package, including the exact image and programming instructions for any programmed parts.

Keep the review concrete

Include these requirements in your enquiry

01

Manufacturer and full MPN are populated

02

Designators are unique within the fitted variant

03

Quantity is stated per assembly

04

DNP positions are controlled

05

Alternatives have approval status

06

BOM and placement are mapped to the same released configuration

Mark unresolved items explicitly. Ask the quotation to identify proposed exceptions, required customer approvals and any inspection or special-process charges that remain open.

See the physical construction

Assembly examples from the PCBSync media library

These physical examples highlight component density, access, interconnects and handling details. Identify the features relevant to your design so the engineering review can focus on your actual build requirements.

Answers before requesting a quote

BOM List FAQ

Is a part description enough for a production BOM?

Usually it is not enough to identify an approved commercial component. Provide the manufacturer and complete MPN or a controlled specification agreed for that item.

Should DNP components be included?

They should be unambiguously represented in the released configuration, whether in a dedicated status field or a clearly linked variant document.

Altium ActiveBOM documentation rechecked 14 November 2026. Apply the current documentation and project-specific acceptance requirements. Planners do not certify manufacturability or validate uploaded design files.

Bring the exact build configuration

Discuss your BOM and assembly requirements

Prepare the assembly release, selected variant, quantities and open component questions. Include the BOM, placement data and assembly drawing where available. Identify proposed alternatives separately from approved parts. On double-sided assemblies, check bottom-side placement orientation and coordinates against the drawing before release.

Use Contact to submit your enquiry or agree an NDA and file-transfer route before sharing confidential data.

The Latest Post