Pinned
Our next site: Hood County, Texas. 17 MW already live, with a path to as much as 311 MW.
Today we announced a 50/50 joint venture with 10NetZero and a signed letter of intent to acquire a live-powered industrial site in Hood County, Texas, with plans to develop it into a


