Contact Sales & After-Sales Service

Contact & Quotation

  • Inquire: Call 0086-755-23203480, or reach out via the form below/your sales contact to discuss our design, manufacturing, and assembly capabilities.
  • Quote: Email your PCB files to [email protected] (Preferred for large files) or submit online. We will contact you promptly. Please ensure your email is correct.
Drag & Drop Files, Choose Files to Upload You can upload up to 3 files.

Notes:
For PCB fabrication, we require PCB design file in Gerber RS-274X format (most preferred), *.PCB/DDB (Protel, inform your program version) format or *.BRD (Eagle) format. For PCB assembly, we require PCB design file in above mentioned format, drilling file and BOM. Click to download BOM template To avoid file missing, please include all files into one folder and compress it into .zip or .rar format.

PCB Assembly / Military PCB
Military PCB · engineering & manufacturing

Military PCB Procurement: Verify Eligibility, Requirements and Traceability

A military PCB purchase begins with the applicable contract requirements and an eligible supply route. Use this page to organise a non-sensitive sourcing review, distinguish qualification from inspection and define the evidence required with a shipment.

Bare boards · PCB assembly · prototype and production enquiries

Dense assembled board with fine-pitch components and multiple I/O connectors.
Dense assembled board with fine-pitch components and multiple I/O connectors.
The design decision

“Military grade” is not a complete purchase specification. Identify the governing documents, required supplier status and approved construction before requesting a manufacturing commitment.

Choose the relevant path

Where the board fits in your product

  1. 01

    Eligibility

    Contract and supplier requirements.

    Verify the permitted supply route.

  2. 02

    Definition

    Controlled part and purchase documents.

    Resolve revisions and exceptions.

  3. 03

    Evidence

    Material, process and inspection records.

    Keep the required traceability links.

  4. 04

    Acceptance

    Review, disposition and approval.

    Use the designated release authority.

Work with your own inputs

Military PCB project tools

Check the release information and calculate the scenario relevant to this board. Add the result to your inquiry so engineering can review the same assumptions.

Military PCB workbench

PCBSync Engineering Tools · no account required · calculations run in your browser

Mark what you have prepared

Decisions before fabrication

What to resolve before the first build

01

Confirm the eligible procurement route

Identify the standards and customer requirements that govern the proposed purchase. Establish who can receive the technical data and who must approve the supplier and manufacturing site.

PCBSync does not claim QML listing or programme eligibility on this page. Where a qualification requirement applies, verify current official evidence and its scope before proceeding with a detailed build review.

02

Separate qualification from product acceptance

DLA maintains qualification information for MIL-PRF-31032 and provides access to the relevant qualified-source information. Use the official source for current status rather than a marketing badge.

Qualification and the requirements for a particular delivered part are distinct. The purchase still needs controlled drawings, applicable revisions, required inspections and clearly defined acceptance records.

03

Make traceability part of the deliverable

Specify the required links between material, fabrication lot, PCB assembly configuration and inspection records. Identify the certificates and supporting data that must accompany delivery.

Define how substitutions and nonconformances are reported and approved. A record should describe the actual disposition; do not relabel a nonconformance as a conforming measurement merely because a deviation was accepted.

04

Review the dossier before release

Assign responsibility for each required document and characteristic. Record what has evidence, what has been reviewed and what remains open.

The online tool counts declared evidence states. It does not establish qualification, inspect restricted files or authorise shipment; the responsible customer and supplier processes determine acceptance.

Engineering handoff

The information that moves a quote forward

A useful quotation starts with a controlled revision and clear open questions. Prepare these items, and mark anything still being decided.

Build an inquiry brief
  1. Non-sensitive procurement description
  2. Applicable supplier and contract requirements
  3. Controlled document/revision references
  4. Required traceability and inspection records
  5. Substitution/nonconformance approval route
  6. Permitted data exchange and release responsibilities
Physical board details

Real boards: construction and connection details

These PCBSync media-library photographs illustrate visible board and assembly construction only. They do not establish military programme experience, qualified status or product approval.

Before you enquire

Military PCB: practical questions

Does this page assert PCBSync is a qualified military PCB source?

No. Any required status must be verified against current official evidence and the actual procurement requirements.

Does IPC Class 3 alone mean a PCB is military qualified?

No. Apply the specific contract, qualification and product requirements instead of equating those labels.

Can I send controlled drawings through the general inquiry form?

First confirm recipient eligibility and an approved transfer route. Start with a non-sensitive scope description.

PCBSync project review

Request a non-sensitive scope review

Tell us what needs to be built

Begin with the general procurement scope and required supplier qualifications. Confirm eligibility and the permitted data-transfer route before sending controlled technical data.

The initial inquiry should identify the required standard, drawing revision reference, quantity and delivery documentation without including restricted design files. Any detailed review depends on an eligible and approved supply route.

[email protected]
+86-755-23203480

Your inquiry requests a review; it does not place an order.

Drag & Drop Files, Choose Files to Upload You can upload up to 3 files.